|
Bids Are invited for Facility Management Services - Lumpsum Based - Emergency Maintenance Contract For Utility Department; O M Of Mechanical Work; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Work Assistance For Day To Day Regular Maintenance Of Compressors, Dryers And Allied Equipments. , Work Assistance For Day To Day Regular Maintenance Of Water Block And Allied Equipments. , Work Assistance For Inspection Of Water Line / Fire Hydrant Line / Fire Fighting Network/ Sprinkler Pipe Lines / Compressed Air Line. , Work Assistance For Chemical Dosing , Work Assistance For Misc. Jobs , Assistance For Store Activities , Area Sweeping, Cleaning Of Equipments, Trenches. , Assistance Fitter (Sw) , Assistance Welder (Sw) , Assistance Rigger (Sw) , Assistance Usw , Alignment Of Pump And Motor , Pump Suction Strainer Cleaning , Cleaning Of Hot Well Sump Of Cooling Tower I , Cleaning Of Hot Well Sump Of Cooling Tower I(E) / I(Ee) , Cleaning Cooling Tower Basin (Per Cell) , Cleaning Of Cooling Tower Deck And Strainer , Preventive Maintenance Of All Equipments Of Swtp/Wwtp , Overhauling Of Sewerage Pump/ Sludge Pump Of Swtp Of Township , Overhauling Of Sewerage Pump/ Sludge Pump Of Swtp Of Cisf , Overhauling Of Feed Water Pump / Zero Discharge Pump , Preventive Maintenance Of All Pumps Of Zero Discharge And Holding Pool /All Pumps Of Feed Water, Lime Dosing And Alum Regeneration , Repair/ Replacement Of Foot Valve Of Holding Pool Pump/Feed Pump Of Df Plant , Repair/ Replacement Of Foot Valve Of Zero Discharge Pump , Preventive Maintenance Of All Equipments Of Incinerator , Replacement Of Pipe Up To 50 Mm Dia , Replacement Of Pipe More Than 50 Mm Upto 150 Mm , Replacement Of Pipe More Than 150 Mm Up To 300 Mm Dia , Dismantling Of Pipe More Than 50 Mm Upto 150 Mm , Repair Of Pipe More Than 50 Mm Up To 150 Mm Dia , Repair Of Pipe More Than 150 Mm Up To 300 Mm Dia , Repair Of Pipe More Than 50 Mm Up To 150 Mm Dia , Repair Of Pipe More Than 150 Mm Up To 300 Mm Dia , Repair Of Pipe Above Ground More Than 12 Mr Height , Excavation Of Earth , Valve Erection Upto 50 Mm , Valve Erection More Than 50 Mm To 100Mm , Valve Erection More Than 100 Mm To 200 Mm , Valve Erection More Than 200 Mm , Valve Repair More Than 50 Mm To 100Mm , Valve Repair More Than 100 Mm To 200 Mm , Valve Repair More Than 200 Mm , Replacement Of Foot Valve 8 In Water Block & Cisf Colony , Preventive Maintenance Of All Hfo Pumps Of Hfo Unloading Area( 8 Unloading Pumps & 1 Reclaiming Pump) , Preventtive Maintenance Of All Hfo And Ldo Pumps Of Hfo & Ldo Storage Tank Area , Unloading Of Hfo From Rake Of 66 Kl Wagons As Per Scope Of Work. , Preventive Maintenance Of Eot Crane , Grass Cutting
|