Part I Of The Order - Paving Works 4.4.1 The Scope Of Work Includes, In Particular: 1). Task 1 - Pedestrian Road -H (Pages 81, 82 Of The Bill Of Quantities) The Task Should Include The Construction Of, In Particular: - A Pedestrian Road With A Surface Of Granite-Like Concrete Slabs, 3.00 M Wide, Framed With 8X30 Cm Graphite Concrete Edges Placed On A Concrete Footing With Resistance, - Terrain Stairs Made Of Concrete Stair Blocks On A Concrete Footing C20/25 With Stainless Steel Balustrades, - Slope Reinforced With Openwork Concrete Slabs, Dimensions. 40X60x10cm - Color Graphite, The Above Task Should Be Performed In Accordance With The Nepryszki River Valley Development Project - Pedestrian Road. - Along The Edge From The Reservoir Side, The Paving Contractor Will Leave A 3 Cm Space For Installing Aluminum Profiles For Led Strips2). Task 2 - Sidewalk At Ul. Źródlana (P. 103, Item 1, P. 104, Item 9, Bill Of Quantities) The Task Should Include, In Particular: - Demolition Works (Fence, Edges And Pavers), - Reinforcement Of The Ground, Min. 6 Cm And Its Profiling, And Securing All Slopes With A Galvanized Steel Mesh - Beavers Excavations, (The Mesh Should Be Dug In Such A Way That It Is Below The Plant Foundations) - Relocation Of The Pedestrian Road Surface With A Surface Made Of Concrete Cubes With A Frame Of 8X30cm Edges - Placed On A Concrete Footing With Resistance,3). Task 3 - Sidewalks A, A1, A2 And A3 (Page 104 Items 10, 11, Page 105 Item 13, 14 Bill Of Quantities) The Task Should Include In Particular: - Demolition Works (The Cubes And Edges Should Be Placed On Non-Returnable Pallets And Transported To The Józefów Commune Base At Ul. Targowa) - Reinforcement Of The Substrate (New Layers) And Its Profiling, As Well As Protection All Slopes With Galvanized Steel Mesh - Beavers Excavations (The Mesh Should Be Dug In Such A Way That It Is Below The Plant Foundations) - Laying The Surface Of The Pedestrian Road With A Surface Made Of Granite-Like Cubes With A Length Of 8X30cm Framed With Concrete Edges - Placed On A Concrete Footing With Resistance, - Demolition Of Stairs Made Of Paving Stones (The Cubes And Edges Should Be Put On Non-Returnable Pallets And Transport To The Józefów Commune Base At Ul. Targowa), Profiling And Compaction, Making Footings For Stair Frames, Laying The Edges And Surfaces Of The Stairs With Granite-Like Cubes. - Partial Renovations Around The Spring, Repairs To Stone Damage (Replacement, Grouting, Cleaning), Cleaning And Repair Of The Existing Granite Pavement. - Renovation Works Of Barriers On The Causeway And Stairs
|