1.1. The Subject Of The Order Is An Investment Called Improving The Quality Of Water Supply Infrastructure In The Pawłów Commune, Which Includes: Modernization Of The Water Treatment Plant In Ambrożów Along With The Replacement Of 2 Expansion Tanks; Modernization Of The Water Intake In Szerzawy Along With The Replacement Of 2 Expansion Tanks; Modernization Of The Water Pumping Station In Dąbrowa; Modernization Of The Section Of The Water Supply Network Supplying The Water Reservoir In Ambrożów; Modernization Of The Water Supply Network From The Hydrophore Plant In Msc. Bronkowice To The Intersection In Msc. Bronkowice/Jaźwiny; Reconstruction Of The Existing Water Supply Network In Msc. Radkowice And Radkowice Kolonia; Monitoring The Water Supply Network To Reduce Water Losses; Replacement Of 70 Fire Hydrants. On The Main Water Supply Network; Delivery And Installation Of A Photovoltaic Installation; Installation Of Monitoring At The Water Pumping Station In Pawłów (Starodroże). The Scope Of Work Includes: 1. Modernization Of The Water Treatment Plant In Ambrożów With The Replacement Of 2 Expansion Tanks: - Modernization Of The Station Building, - Pumping Station For Rinsing Water (Technological Sewage) From The Water Treatment Plant, - Replacement Of The Existing Hydrophore And Pump Set Along With The Technological Water Supply Installation.2. Modernization Of The Water Intake In Szerzawy Along With The Replacement Of 2 Expansion Tanks, Including Modernization Of: - The Intake Building, - Replacement Of Two Existing Expansion Tanks For Drinking Water With A Capacity 150M3, - Construction Of An Expansion Tank For Drinking Water With A Capacity Of 150M3, - Replacement Of The Existing Hydrophore And Pump Set With Technological Water Supply Installation.3. Modernization Of The Water Pumping Station In Dąbrowa, Including Modernization Of: - The Pumping Station Building, - Disassembly And Replacement Of The Existing Hydrophore Set And Installation Of A Connection Between The Set And The External Water Supply Network.4. Modernization Of The Section Of The Water Supply Network Supplying The Water Reservoir In Ambrożów - The Total Length Of The Designed Water Supply Network Pe100 Sdr11 Pn16 Ø160x14.6Mm Is 314.5M.5. Modernization Of The Water Supply Network From The Hydrophore Plant In Bronkowice To The Intersection In Bronkowice/Jaźwiny - Total Network Length 2,449.5 M6. Reconstruction Of The Existing Water Supply Network In Radkowice And Radkowice Koloniathe Investment Includes The Reconstruction Of The Existing Pvc Water Supply Network Ø225mm And A Steel Pipeline Dn200mm From The W1 Connection Node To The W2 Node, Planned To Be Implemented Using The Directional Drilling Method Using Pe100 Rc Pipes Ø160x14.6Mm - 2963M.7. Monitoring Of The Water Supply Network In Order To Reduce Water Losses. The Task Concerns The Delivery And Installation Of 40 Measuring Posts On The Water Supply Network With Diameters Ranging From 90 To 225 Mm. The Scope Of The Task Inc
Contact Information
Address
Gmina Pawłów,Pawłów,27-225,Świętokrzyskie,Pl721 - Kielecki
Contact No.
412721614
Email
inwestycje@pawlow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117537974
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.