|
Tender for Construction Of Community Sanitary Complex For Girls At Panchayat Union Primary School At Kalaignanapuram Village Vaippar Panchayat (Type-3) , Construction Of Community Sanitary Complex For Girls At Panchayat Union Primary School At Kalaignanapuram Village Vaippar Panchayat (Type-3) , Earth Work Excavation For Foundation In All Soils And Sub Soils To Full Depth Etc., Ordinary Soil Complete , Cement Concrete 1:4:8 (One Cement, Four Sand And Eight Hard Broken Stone Jelly) Using 40 Mm Gauge Hard Broken Granite Stone Jelly For Foundation Including Dewatering Wherever Necessary And Laid In Layers Of Not More Than 15 Cm Thick, Well Rammed, Consolidated And Curing Etc. Complete Complying With Standard Specification . , Random Rubble Masonry In Cm 1:5 Foundation And Basement Including Simultaneously Flush Pointing Including Curing Neat Finishing, Etc., Complete Complying With Standard Specifiction. , Brick Work Using Country Bricks Of Size 83/4X41/4X23/4 In Cement Mortar 1:5 (One Cement And Five Sand) Including Curing Neat Finishing, Etc., Complete Complying With Standard Specifiction. , Supplying And Erecting Centering For Sides And Soffits Including Necessary Supports And Strutting Upto 3.29 M Height For Plane Surfaces As Detailed Below In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60 Cm And 10 Bg Stiffened With Welded Mild Steel Angle Of Size 25Mm X 25Mm X 3 Mm For Boarding Laid Over Silver Oak Joists Of Size 10Cm X 6.50 Cm Spaced At Abote 90 Cm Centre To Centre And Supported By Casurina Props Of 10Cm To 13 Cm Dia Spaced At Not More Than 75 Cm Centre To Centre Etc. Complete Complying With The Standard Specificaiton. (Payment For Centering Shall Be Given After The Concrete Is Laid) , Centring Bgl , Centring Agl , Cement Concrete 1:1-1/2:3 (One Cement, One And A Half Crushed Stone M.Sand And Three Hard Broken Stone Jelly) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For All Reinforced Cement Concrete Items Of Works Excluding Cost Of Reinforcement Grill And Fabricating Charges Centering And Shuttering But Including Laying, Vibrating With Mechanical Vibrators, Finishing, Curing, Etc. And Providing Fixtures Like Fan Clamps In The Reinforced Cement Concrete Floor / Roof Slabs Wherever Necessary And Bearing Surfaces Of Walls, Beams Etc. Shall Be Finished Smooth With Cement Mortar 1:3 (One Cement And Three M.Sand) And Kraft Paper Laid Over It Without Claiming Extra, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Supplying, Fabricating And Placing In Position Mild Steel / Ribbed Tor Steel Grills For All Reinforced Cement Concrete Works As Per Design Given Including Cost Of Steel And G.I. Binding Wire In All Floors Etc. Complete Complying With Standard Specification. (Contractor Has To Make His Own Arrangements For The Supply Of Steel And Binding Wire) , Supplying, Fabricating, Erecting And Fixing Of Uv Coated Poly Carbonite Sheet 10Mm Thick Tubular Box Section Of L00x50x3mm Of Lmeter Interval Including Priming Coat Fixing In Position With All Necessary Accessories Complete Complying With Standard Specification And As Directed By The Departmental Officers. , Supplying, Fabricating, Erecting And Fixing Of Stainless Steel Including Priming Coat Fixing In Position With All Necessary Accessories Complete Complying With Standard Specification And As Directed By The Departmental Officers. , Supplying, Fabricating, Erecting Structural Steel Works , Supplying And Applying Of Two Coats Of Putty Of 3Mm Thick Over The Exposed Reinforced Cement Concrete Surface Of Ceiling Including Finishing The Joints Smoothy With Grinding Machine And The Surface Shall Be Thoroughly Cleaned Out Of Dust And Scrubbing. The Surface Shall Then Be Allowed To Dry For Atleast 48 Hours. It Shall Then Be Sand Papered (Waterproof Abrasive Sheet) To Give A Smooth And Even Surface. Any Unevenness Shall Be Made Good By Applying 1St Coat Of Putty Mixed With Water On The Entire Surface Including Filling Up The Undulations And Applying 2Nd Coat Of Putty After 6 Hours Of 1St Coat Of Putty And Then Sand Papering (Waterproof Abrasive Sheet) The Same After It Is Dry And Finishing The Surface Smoothly, Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. [The Rates Are Inclusive Of Hire Charges For Grinding Machine With Wheel, Cost Of Sand Paper (Waterproof Abrasive Sheet), Cost Of Putty Blade, Labour Charges For Grinding The Joints And Sand Papering, Two Coat Of Putty, Scrapping The Putty Area To Level The Surface Smooth, Etc., Complete]. The Putty Shoule Be Got Approved By The Executive Engineer Before Use On Work , Plastering With Cement Mortar 1:5 (One Cement And Five Sand), 12Mm Thick In All Floors Including Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. , Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 230Mm X 230Mm X 20Mm Of Approved Quality Set In Cement Mortar 1:3 (One Cement And Three Crushed Stone M.Sand) 12Mm Thick Mixed With Water Proofing Compound Conforming To Iss At 2% By Weight Of Cement Used And The Joints Pointed Neatly To Full Depth Of Tiles With The Same Cement Mortar Mixed With Red Oxide And Water Proofing Compound Including Curing Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers , Paving The Floor With Pre-Polished Concrete Anti-Skid Tiles (Required Shape And Design) Of 20Mm Thick Of Approved Quality And Colour Laid In Cement Mortar 1:3 (One Cement And Three Crushed Stone Sand) 20Mm Thick And Pointed With White Cement Mixed With Colouring Pigment At The Rate Of 0.40 Kg. / Sq.M., Curing, Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers. (The Make And Brand Of The Tiles Should Be Got Approved By Executive Engineer Before Use On Works) Using Anti-Skid Tiles (Observed Data) , Dadooing Walls With Following Best Approved Quality, White / Colour Glazed Tiles Of Following Sizes Set In Cement Mortar 1:2 (One Cement And Two Crushed Stone M.Sand) 10Mm Thick And Pointing The Joints With White Cement Mixed With Colouring Pigments At The Rate Of 0.40 Kg. / Sq.M. Neatly In All Floors, Curing, Etc., Complying With Standard Specification And As Directed By The Departmental Officers. , Painting The Walls With Two Coats Of Oil Bound Distember Over One Coat Water Based Cement Primer Including Cost For Distember ,Primer,Cleaniong And Scrapping The Walls Rendering Theb Walls Smooth With Necessory Putty,Brushes, Scaffolding Arrangements,1Abourb Chareges,Etc., , Painting Two Coats Of Newly Plastered Wall Surface With Ready Mixed Plastic Emulsion Paint Of First Class Quality And Of Approved Colour Over A Priming Coat Including Thorough Scrapping, Clean Removal Of Dirt, And Including Necessary Plaster Of Paris Putty, Wherever Required Etc., Complete Complying With Standard Specification. , Painting New Iron Works Such As Steel Doors, Windows, Ventilators, Window Bars, Balustrades Etc., With Two Coats Of Best Approved First Quality And Colour Of Synthetic Enamel Paint Over The Existing Red Oxide Priming Coat In All Floors Excluding Cost Of Priming Coat Etc., Complete Complying With Standard Specification. (The Make, Quality And Colour Of Paint Should Be Got Approved By The Executive Engineer Before Use On Works.) , Supplying And Fixing In Positon Indian Water Closet (Oriya Type) Of Size 580 X 440Mm White Glazed Earthern Ware Of Approved Quality And Brand With P Or S Trap Conforming To Bis With Crushed Stone M.Sandcushion And Forming Flooring Alround The Closet Using 40Mm Broken Brick Jelly In Lime Concrete 1:2:5 (One Lime, Two Crushed Stone M.Sandand Five Brick Jelly) L00mm Thick And Finishing The Top To The Required Slope And Including Giving Necessary Connection To Ci Soil Pipes (Including The Cost Of L00mm Dia Ci Pipe For A Length Of 600Mm) By Dismantling Brick Masonry Wall / Reinforced Cement Concrete Roof/ Floor Slab And Making Good The Dismantled Portion To The Original Condition With Leakages Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. (The Water Closet Should Be Got Approved By The Executive Engineer Before Use On Works). , Supplying And Fixing In Positon Indian Make White Glazed Earthern Ware Squatting Type Urinal Of Best Quality And Approved Make Including Dismantling Masonry, If Necessary Nad Re-Doing The Same Tomoriginla Condition, Etc., Complying With Standard Specifications . (The Squatting Type Urinal Should Be Got Approved By The Executive Engineer Before Use On Works). , Manufacturing Supplying And Fixing Of Steel Door With The Following Specification Ms Angels Of Size 40X40x6mm Are Used For The Outer Frames And M.S. Angles Of Size 35X35x5mm For The Shutter Frames Stiffeners With 32 X 6Mm M.S Flat Is Provided At Required Intervals In The Shutter Frame. 18-Gauge C.R. Sheet Laid As Panel In The Shutter And Welded Intact. M.S. Flat L8x5mm Is Welded Over The 32 X 6Mm M.S. Flat M.Sandwitching The C.R. Sheet In Between Additional Stiffeners With L8x5mm M.S. Flat Is Provided Diagonally At The Rear Side Of The Shutter, 3Nos. Of Hinges In Case Of Single Leaf And 6Nos. Of Hinges In Double Leaves Shutter To Be Provided 6Nos. Of Holdfasts 120 Mm In Length Made Of Angle Section Spliced At The Ends Are Welded To The Outer Frames Of The Door. Tower Bolts 2Nos. One At The Top And The Other At The Bottom Are Provided 1No. Aldrop Is Provided Incase Of Double Leaf Door At Lock Rail Section In The Door In Single Leaf Door, One More Aldrop Is Provided In The Inner Lock Rail Section Of The Door One Rotaing Locking Arrangements For The Inner Side Of The Door And Additional Provision For Locking Arrangements For Lock Is Provided On The Rear Side Of The Door At An Appropriate Place. Incase Of Double Leaf Door M.S.Flat 32 X 3Mm At 1.1Kg/M Is Provided On The One Shutter T Conceal The Gap Between The Two Shutters.At An Appropriate Place In The Door. A Tie Bar Is Provided At The Bottom Of The Frame To Prevent Twisting Of Frame During Transportation And Fixing. All Members Are Given A Coat Of Red Oxide Primer As Directed By The Departmental Officers. The Rate Includes Cost Of All Materials, Labour Charges, Transportation To Site Of Work, Loading, Un Loading And All Other Incidental Charges Etc., Complete. , Sanitary Arrangements , 110Mm Dia Pvc Pipe , 110Mm Dia Pvc Door Elbow , 110Mm Dia Pvc Tee , 2000 Lit Pvc Tank , Brick Jelly 40Mm Size For Filling Soak Pit Inner Etc., Complete Complying With Standard Specifiction. , Provision For Epl Arrangements , Supply And Delivery Of 63Mm 4 Ksc Pvc Pipes For Pumping Main System , Earthwork Excavation And Depositing On Bank With Initial Lead Of 10M And Lift Of 2M In Narrow Trenches For Laying Of Pipesin Hard Stiff Clay,Stiff Black Cotton,Hard Red Earth,Shales,Murram ,Gravel,Earth Mixed With Small Sized Boulders Etc... , Laying Of 63 Mm Pvc 4 Ksc Pipes To Proper Line And Level Including Jointing But Excluding Cost Of Pipes , Refilling The Excavated Earth After Laying And Joining Of Pipes Including All Labour Charges Etc..Complete , Solid Pvc Door Shutters Using 19 Gauge 19Mm Ms Square Tubes For Styles And Outer Frames. 15Mm Ms Square Tubes For Top, Lock And Bottom Rails. The Steel Tubes Shall Be 5Mm Thick Solid Pvc Sheets For Panelling Shall Rigidly Fixed In Position Including Necessary Furniture And Fittings. The Over All Size Of Styles Shall Be 50Mm X 30Mm. The Over All Size Of Top Rail, Lock Rail And Bottom Rail Shall Be 75Mm X 30Mm. The Over All Size Of Frames Shall Be 50Mm X 45Mm With Suitable Rabate For Housing The Shutter , Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package}
|