1. The Subject Of The Order Is The Performance Of Construction Works Consisting In The Modernization Of Ul. Łąkowa - Access Road To Agricultural Land In The Bieruń Commune, As Part Of The Budget Task Entitled: Access Road To Agricultural Land - Ul. Łąkowa, In Accordance With The Scope Presented Below: A) Implementation Of Temporary Traffic Organization, B) Surveying Works, C) Construction Works - Preparatory, Demolition, Earth, Assembly And Surface Works, Including: • Modernization Of The Road Section - Ul. Łąkowa With A Length Of 581 M And A Width Of 3.50 M, In The Scope Of: - Making A Cut With A Thickness Of 10 Cm Of The Existing Asphalt Surface, 15.0 M Long, - Construction Of A Trough With A Depth Of 30 Cm (Road) And Depth 10 Cm (Roadside) Along With The Removal Of Rubble To The Landfill/Landfill And Its Disposal (The Distance Of Removal Is Determined By The Contractor), - Profiling And Compacting The Subgrade For The Construction Layers Of The Pavement, - Making And Compacting The Subbase Of Crushed Aggregate - Dolomite Fraction 0-31.5 Mm With A Thickness Of 20 Cm After Compaction, - Making A Road Surface With A Width 3.50 M Of Mineral-Bituminous Mixtures Thick. 10 Cm, I.E. Ac16w Bonding Material, Thickness: 6 Cm And Ac11s Abrasive Insert, Thick. 4 Cm (50/70 Kr2), After Cleaning And Sprinkling The Unimproved And Bituminous Surface With Asphalt Emulsion And Adjusting The Existing Road Infrastructure Elements, - Hardening Of The Roadsides On Both Sides With A Width Of 30 Cm And A Thickness Of 10 Cm With Reclaimed Asphalt, - Connection Of The Road Surface Of Ul. Łąkowa With Existing Asphalt Roads, • Greenery - Felling Of 3 Black Alder Trees (Single-Stem With Trunk Circumference: 279 Cm, Two-Stem With Trunk Circumference: 55 And 35 Cm, Six-Stem With Trunk Circumference: 35, 50, 41, 30, 35 And 32 Cm) Along With Grubbing Up The Trunks And Loading, Removal, Storage And Disposal Of Stumpwood And Branches (The Distance Of Removal Is Determined By The Contractor). Note - The Contractor Will Manage, I.E. Purchase, The Wood Obtained From Felling. D) As-Built Documentation.2.The Scope Of Works And Their Description Are Included In The Swz And In The Annexes To The Swz, I.E.: Detailed Description Of The Subject Of The Contract (Sopz) With Annexes, And In The Draft Provisions Of The Contract With Annexes.3.Pursuant To The Content Of Art. 95 Section 1 Of The Public Procurement Law, The Ordering Party Informs That It Sets Requirements Regarding The Employment Of The Contractor Or Subcontractor On The Basis Of The Employment Relationship Of Persons Performing Activities In The Scope Of The Contract Consisting In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Consolidated Text: Journal Of Laws Of 2020, Item 1320, As Amended). Details Are Included In The Draft Provisions Of The Contract, Which Constitute An Annex To Swz.4.The Order Is Covered By External Financial Support - Co-Financed From The Budget Of The Sile
|