|
1. Expansion Of The Heating Network With Connections And Construction Of A Telemetric Cable Pipeline In Mickiewicza Street Within The Right-Of-Way Of District Road No. 3707E, Section 236, Rąkczyn Area In Poddębice. The Following Should Be Constructed: 1) Heating Network - In The Technology Of Pre-Insulated Steel Pipes With A Diameter Of 2X114.3/200 Mm With A Total Length Of 200 M, 2) Connections To The Property - In The Technology Of Pre-Insulated Steel Pipes With A Diameter Of 2X42.4/110 Mm With A Total Length Of 38.5 M: • Connection To The Property No. 2A, Plot No. 231/2, Dn. 2X42.4/110 Mm With A Length Of L = 11.5 M, Including L = 8.5 M Using The Open Excavation Method And L = 3.0 M Using The Trenchless Method Under A Pedestrian And Driving Route Made Of Concrete Cubes, Including The Installation Of Pre-Insulated Cut-Off Valves Dn. 2X42.4/110 Mm, • Connection To Property No. 4, Plot No. 445, Dated 2X42.4/110 Mm With A Length Of L = 9.0 M, Including L = 6.0 M Using The Open Excavation Method And L = 3.0 M Using The Trenchless Method Under A Pedestrian And Driving Route Made Of Concrete Cubes, Including The Installation Of Pre-Insulated Cut-Off Valves Dn. 2X42.4/110 Mm, • Connection To Property No. 38, Plot No. 3, Dated 2X42.4/110 Mm, Length L=6.0 M, Open Excavation Method With Installation Of Pre-Insulated Cut-Off Valves Dn. 2X42.4/110 Mm, • Connection To Property No. 6, Plot No. 229/11, Dn. 2X42.4/110 Mm With A Length Of L = 12.0 M, Including L = 9.0 M Using The Open Excavation Method And L = 3.0 M Using The Trenchless Method Under A Pedestrian And Driving Route Made Of Concrete Cubes, Including The Installation Of Pre-Insulated Cut-Off Valves Dn. 2X42.4/110 Mm, And In The Technology Of Pre-Insulated Steel Pipes With A Diameter Of 2X48.3X110 Mm With A Total Length Of 3.0 M: • Connection To The Property No. 40/42, Plot No. 4/1, Dn. 2X48.3/110 Mm, Length L=3.0 M, Open Excavation Method With Installation Of Pre-Insulated Cut-Off Valves Dn. 2X48.3/110 Mm, And In The Technology Of Pre-Insulated Steel Pipes With A Diameter Of 2X60.3X125 Mm With A Total Length Of 12.0 M: • Connection To Plot No. 229/8, Dn. 2X60.3/125 Mm, Length L = 12.0 M, Including L = 9.0 M Using The Open Excavation Method And L = 3.0 M Using The Trenchless Method Under A Pedestrian And Driving Route Made Of Concrete Cubes, Including The Installation Of Pre-Insulated Cut-Off Valves Dn. 2X60.3/125 Mm. The Works Should Be Coordinated With Road Works That Will Be Performed On The Subject Section Of The Road, For Which The Investor Is The District Office In Poddębice. Reconstruction Of The Asphalt Surface At The Excavation Site Should Be Performed Without A Wearing Course. 3) Construction Of A Telemetry Cable Pipeline With A Diameter Of Ø40 From The Planned Connection With A Total Length Of Approx. L = 260 M For The Entire Scope Of The Heating Infrastructure Being Built. The Yofc Z-Xotktsddb Fiber Optic Cable Will Be Placed In The Cable Pipeline.
|