Building Installation Work – Chl Nbc Ve 4750 Deckenlifter. As Part Of The New Building, The Center Hospitalier De Luxembourg Intends To Procure Several Ceiling Running Rails Or Ceiling Lifts (With Electric Motor Height Adjustment Including Substructures) In Accordance With The Procurement Procedure Book Ii Open Procedure (Loi, Art. 63 And 65). Part Of The Tender Is The Delivery And Assembly Of: - 24 Ceiling Running Rails With A Rail With An Infusion Holder That Can Be Moved Across The Patients Space - 2 Patient Lifting Systems, U/B Room / Transfer Lock As A 1-Bed Heavy-Duty Room - 53 Patient Lifts For 1-Bed Standard Rooms (General Care) - 2 Patient Lift Systems Over The Toilet, 1-Bed Heavy-Duty Rooms (General Care) - 45 Patient Lift Systems With Infusion Ceiling Rails, 1-Bed Standard Rooms (Intensive Care) - 2 Patient Lift Systems With Infusion Ceiling Rails Infusion Pole, 1-Bed Heavy-Duty Room (Intensive Care) - 1 Patient Lift System With Infusion Ceiling Rail Incl Substructures, Assembly Of Ceiling Lifts, Delivery Of Accessories Immediately Before Commissioning (Theft Prevention). The Adjustment Of Stops In The Turning Area Must Be Carried Out With The Users/Representatives. 1 Main And 1 Repair Appointment Are Covered By The Offer Price, With The Partial Services Being Staggered According To The Schedule And Coordinated With The Local Construction Management/Specialist Construction Management. The Statutory Limitation Period For Warranty Claims Begins On The Day Of Acceptance (Including Complete Assembly). Remedy Of Defects) Is The Beginning Of The Warranty. The Following Services Must Be Offered And Calculated In Addition To The Device-Related Services: - The Contractor (Contractor) Must Be Involved In The Collision Check By The Coordinating Architect (4Bund). Preliminary Remarks On Medical Technology Suitability Criteria According To General And Special Contractual Conditions, Point 1.10 / Point 2.10 The Following Dates Are Decisive For The Deliveries And Assembly Of The Devices: Possible Start Of Installation: October 4Th, 2027 Latest Completion Of Assembly: March 29Th, 2029 (Interior Construction + Technology According To General Flow Plan_V5) Taking The Start Date Into Account, An Assembly Schedule Must Be Presented And, If Necessary, Based On The Architects Specifications (4Bund) The Times Required For Insertion And Assembly Must Be Recorded For Each Device Type.
Contact Information
Address
4, rue Ernest Bablé
Contact No.
441111
Email
coord.travaux@chl.lu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117449960
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.