Reservoir Construction Works – Weinstetten Landfill Construction Of The Leachate Basin. 2-Chamber Seepage Water Basin Made Of Reinforced Concrete With Internal Pe Lining: Construction Pit Excavation: Approx. 4,000 M³, Building Backfill: Approx. 2,000 M³, Support Pile Shoring, Piped Bores: Approx. 420M, Wooden Infill Support Beam Shoring: Approx. 720 M², Pile Beams, Girts And Stiffeners: Approx. 75 To, In-Situ Concrete Floor/Walls: Approx. 250 M³ Pehd Concrete Protection Panels: 950 M², Pressure Line Da90 Incl. Excavation Up To 1.5M: Approx. 200M,