|
Architectural, Construction, Engineering And Inspection Services – Klinik Immenstadt, Ba 1, Extension Building Northwest, Property Planning Buildings And Interiors In Accordance With §§ 33 Ff Hoai 2021, Lph 3-9, For Gradual Commissioning.. The Subject Of The Order Is Property Planning Services For Buildings And Interior Spaces In Accordance With §§ 33 Ff Hoai 2021, Lph 3-9 When Commissioned In Stages. If Necessary, Various Special Services Will Also Be Commissioned.------The Klinikverbund Allgäu Ggmbh Is Planning To Construct The New Building Construction Phase 1 Expansion Building Northwest At The Klinik Immenstadt Location.------The Klinik Immenstadt Is A Hospital Of The Klinikverbund Allgäu.------At The Immenstadt Site, There Is An Additional Space Requirement For The Klinikverbund Allgäu Ggmbh Due To The May 2026 The Bavarian State Ministry For Health, Prevention And Care Decided To Increase The Planned Number Of Beds To 230 Beds And To Create Additional Rooms That Are Currently Missing. The Construction Project Is Called “Construction Phase 1 Extension Northwest”. ------The New Building With A Usable Area Of Approx. 3,921 M² According To The Target Planning Comprises Four Floors With: - Basement: Technology, Changing Rooms - Ground Floor: Doctors Offices, U+B Rooms, Pastoral Care, Social Services, Room Of Silence - 1St Floor: High-Care Bed Ward - 2Nd Floor: Doctors Offices, Administration, Meeting Rooms, Archive - 3Rd Floor: Nursing Station, Elective Services There Are Areas On The Roof Intended For A Technical Center (E.G. Ventilation Center) And Pv System. ------To Clear The Construction Site, Dismantling Work, Divisional Adjustments And Sewer Relocations Are Also Required In The Area Of The Construction Site Or The Adjacent Sidewalk. The Client Is Currently Obtaining Current Division Plans. ------The Implementation Of Clearing The Construction Site, Dismantling The Chapel, Constructing The New Building, Converting The Existing Building And Establishing The Necessary Connections To The Building Complex Takes Place In Several Construction Phases. ------The Oxygen Tank Needs To Be Relocated; The Northern Area Of The Property In Front Of The Access To The Gzi Parking Lot Is Favored As The New Location. ------The Excavation Base Will Be Below The Mean Groundwater Level; According To Current Knowledge, Sheet Pile Walls Are Required For The Excavation Pit, Which Are Integrated Into The Sea Clay Layers. ------A Subsoil Expert Will Be Commissioned Promptly For The Further Planning Steps. ------In Addition To The New Building, A Renovation Of The Existing Building Is Planned In The Form Of An Expansion Of The Central Emergency Room (Creation Of Monitoring Stations, Previously: Changing Rooms) In The Basement (See Plan). During Construction, Access To The Central Emergency Room Must Be Possible Without Restrictions. -----The Enclosed Room And Functional Program Was Approved By The Bavarian State Ministry For Health, Prevention And Care. The Project Is Applying For Funding In Accordance With Article 11 Baykrg. The Framework Conditions Under Funding Law (Including Deadlines, Procurement Regulations, Requirements For Funding Application Documents) Must Be Adhered To When Executing The Project.------ The Planning Law Assessment Is Carried Out In Accordance With Section 34 Of The Baugb------ The Specialist Disciplines Commissioned To Prepare The Funding Application In June 2026 Are Considered Pre-Existing
|