|
Backb. Bitumen, 2 Layers, 380M2; Dtw, 155M. Sealing, Including: Polymer Bit. Welding Membrane, Top Layer, 380M2. Connection Construction, Including: Titanium-Zinc, Double Standing Seam, 26M2. Flat Roof, Ext. Greened, Including: Gradient Insulation, Mifa, 035, D= 40-200Mm, 130M2. Timber Construction Among Others: Bsh, Gl24c, 24X105-165Cm, Transverse Tension Reinforcement: 54 Incl. Threaded Rods M12-4.6, 5Pcs; Purlins And Rafters, 1,335M. Gable Roof, Including: Zwi-Spar.-Däm Miwo, 032, D=240Mm, Wood Fiber Insulation, 046, D=40Mm, Lightweight Concrete Panels, Cement-Based. And Fiberglass Reinforcement D=30Mm, 780M2. Pv In-Roof, Uk With Pv Modules, Spaced. Total Package, One Manufacturer, Among Other Things: Modules, Aluminum Support Plate, W Approx. 75Mm, 775M; Din Rail Connection Joints 500 Pieces; Wt Profiles, Continuous Cast Aluminum, Black Anodized, Horizontal Support With Screw Channel For Modules And For Screwing. The Terminal Strips, 1,775M; Dc Cable And Installation System. Solar Cable, Including Mc4 Plugs And Sockets 1,6000M; Cable Management Plate, Solar Cable 500M. Lightning And Surge Protection, Including: Junction Box With Dc Surge Protection. Type 1+2, 8 Strings 1 Piece, Changer. And Accessories
|