|
1. The Subject Of The Order Is The Execution Of Construction Works Under The Task Construction Of The Monument To Captain Witold Pilecki In Chrzanów And Development Of Green Areas Between Ul. Mickiewicza And Ul. Śląska In Chrzanów. 2. The Scope Of The Subject Of The Contract Includes: 1) Construction Of The Monument To Captain Witold Pilecki: A) Collection And Transport Of The Finished Plaster Model From The Workshop In Chrzanów To The Foundry, B) Execution Artistic Casting In Bronze. Figure Of Captain Witold Pilecki Made Entirely Using Lost Wax Technology, Certified Bk (Silicon) Bronze Material, Along With Presentation Of Specifications From The Manufacturer, C) Finishing Works, Welding And Carving, Sandblasting, Patina, Protection Of The Entire Cast Against Weather Conditions, D) Transport Of The Cast, Assembly (Installation) Of The Sculpture At The Destination (Chrzanów), E) The Foundation Of The Monument Is Made Of Architectural Concrete. The Upper Surface Is Made Of Strzegom Granite Slabs, 2 Cm Thick, Burnt Structure. Annex No. 8 To Swz Is Amended - Technical Design - Architecture - Description, Point 3.10.1. Finishes: The Monuments Pedestal Will Be Made Of 80 M Thick Strzegom Granite Slabs And From Natural Granite Cubes 6X6 It Is: The Monuments Pedestal Will Be Made Of Architectural Concrete. The Upper Surface Will Be Made Of Strzegom Granite Slabs, 2 Cm Thick, Burnt Structure. 2) Development Of The Square Area: A) Preparatory Works, B) Works On Various Surfaces, C) Small Architecture - Purchase, Delivery And Assembly, E) Planting Of Greenery, 3) Preparation Of Documentation As-Built In 2 Copies, Containing: A) Acceptance Reports, Test Reports, Measurement Reports And Other Necessary Protocols Confirming The Proper Performance Of Construction And Installation Works During Construction, B) Surveying Report, C) Material Cards, D) As-Built Cost Estimates, E) Drawings And Descriptions Supplementing The Design For The Implementation Of The Facility, If Any Were Made. As-Built Documentation Must Be Complete And Signed By The Construction Manager And Approved By The Investors Supervision Inspector. 4) Providing Surveying Services: 5) Extending Or Obtaining New Industry Arrangements Enabling The Execution Of Works, 6) Obtaining A Conservation Permit, Conducting Research, Archaeological Supervision, Archaeological Documentation, 7) Removing Trees And Shrubs Interfering With Construction Works Necessary To Carry Out The Investment. Inventory, Felling Plan, Planting Design, Obtaining A Decision For Felling And Any Possible Ones Replacement Plantings And Costs Related To The Obtained Felling Decision, 8) Preparation Of An As-Built Geodetic Map. 3. Detailed Opz Was Specified In The Appendices To The Swz: Design Documentation - Annex No. 8 To The Swz, Stwiorb - Annex No. 9 To The Swz And, Additionally, In The Bill Of Quantities - Annex No. 10 To The Swz.4 Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred
|