The Subject Of The Order Are Construction Works Consisting In The Construction Of Street Lighting In The Kluki Commune Using Modern Energy-Saving Solutions. Part 1 - Construction Of Street Lighting In The Town Of Cisza: Scope To Be Completed: From Pole L1 To L13 With The Sso Connector. The Investment Will Run Through Plots No. 203, 206, 207, 270, Cisza Commune Precinct. Kluki And Will Consist In The Construction Of A 0.4 Kv Street Lighting Overhead Line With Asxsn 2X25 Mm2 Cables, E And Żn Concrete Poles With 70 W Led Lighting Fixtures On 1 M Booms And An Sso Street Lighting Control Connector. The Overhead Street Lighting Line Should Be Constructed On Designed Pole Stands Of The Type E10.5/6, E10.5/4.3 And Żn 10, Placed Directly In The Ground. The Footing Should Be Selected For Medium-Sized Soil. The Location Of Poles No. L1 To L13 Should Be Made In Accordance With The Land Development Plan. The Poles Should Be Protected In The Part Under The Ground With A Bituminous Layer Up To The Height Of 35 Cm Of The Protruding Part Of The Pole Above The Ground Level. The Asxsn 2X25 Mm2 Cable Should Be Installed On The Designed Pole Positions From The Designed Pole No. L1 To The Pole No. L13. For Assembly, Use Pass-Through Holders And Guy Holders Mounted On Hanger Hooks In Accordance With The Applicable Insulated Cable Installation Technology. The Requirements For Led Lighting Fixtures Are Described In Detail In The Swz. A Detailed Description Of The Subject Of The Order Can Be Found In The Design Documentation Constituting Annex No. 1 To The Swz For Part 1. The Design Documentation Includes A Broader Scope Than That Described For Implementation: A) Construction Design B) Land Development Design C) Architectural And Construction Design D) Information Regarding Safety And Health Protectione) Technical Designf) Decision On The Location Of A Public Purpose Investment No. 6/2023/Licpg) Certificate Of The Starosta Of Bełchatów No.: Ab.6743.239.2023.Eb Of October 24, 2023 On The Lack Of Objection To The Notificationh) Bill Of Quantitiesi) Detailed Technical Specification For The Execution And Acceptance Of Construction Worksthe Above Documents Constitute Attachments To This Tor. The Bill Of Quantities Attached To The Swz Is Illustrative And Helps The Contractor Identify Construction Works. In Order To Determine The Correct Amount And Type Of Works For The Purposes Of Preparing An Offer, The Ordering Party Suggests Analyzing The Remaining Components Of The Design Documentation, As Well As Analyzing The Technical Specification For The Execution And Acceptance Of Construction Works. The Ordering Party Requires The Contractor To Carefully Analyze The Infrastructure Of The Area Around The Investment. Warranty And Warranty Period: The Minimum Warranty And Warranty Period Is 60 Months. The Length Of The Warranty And Warranty Period Is One Of The Criteria For Selecting The Offer.
Contact Information
Address
Gmina Kluki,Kluki,97-415,Łódzkie,Pl713 - Piotrkowski
Email
sekretariat@kluki.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117400805
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.