1. Scope Of Works To Be Carried Out:1.Renovation Of The Maneuvering Area At Building No. 191) Grading Of The Subfloor2) Profiling Of The Subfloor 3) Mechanical Compaction Of The Subfloor5) Excavations For The Installation Of Bumpers In Front Of The Entrance Gates To The Building And Replacement Of The Sewage Network6) Embedding Of The Bumpers By Concreting Them With Concrete To A Depth Of 1.0 M7) Laying A Layer Of Geotextile8) Making A 45 Cm Thick Foundation Of Crushed Concrete In Two Layers With Compaction9) Reinforcement Of The Area Around Manholes And Sewage Grates With Reinforced Mesh Of 10 Mm Diameter, Mesh Size 10X10 Cm10) Laying The Surface Of The C35/45 Concrete Mix, 25 Cm Thick, With Slopes And A Surface With A Brushed Structure11) Cutting The Expansion Joints To A Depth Of 1/3 Of The Thickness Of The Concrete Slab12) Filling The Expansion Joints With Expansion Cords And Mass Sealing13) Concrete Care2.Renovation Of Building No. 191) Grading Of The Substrate2) Profiling Of The Substrate 3) Mechanical Compaction Of The Substrate4) Construction Of A Foundation Layer Of C8/10 Concrete, 10 Cm Thick5) Laying 1 Layer Of Horizontal Insulation Of The Substrate With 0.5 Mm Pvc Foil6) Laying The Surface Of A C30/37 Concrete Mix, 20 Cm Thick, With Mechanical Troweling With Trowels And Mineral Sprinkles7) Cutting Expansion Joints On Depth 1/3 Of The Thickness Of The Concrete Slab8) Completing Expansion Joints With Expansion Cords And Sealing Compound9) Concrete Care10) Replacement Of Window Joinery With Aluminum Joinery11) Installation Of Fanlights Over All Gates12) Installation Of Switchgear, Installations And Gate Lighting Lamps Outside The Building13) Carrying Out Protective Measurements And Checking The Electrical Installation14) Construction Of The Front Façade Of The Building15) Replacement Machining Of Entrance Gate Jambs16) Painting Of Gate Jambs17) Chipping And Local Supplementation Of The Internal Plaster On The Gable Wall On The Eastern Side (Plaster Cracks)18) Completing The Painting Of The Plaster Of The Internal Walls With Emulsion Paint19) Painting The 50 Cm High Plinth With Oil Paint And Preparing The Surface In The Rooms20) Renovation Of The Front Façade Of The Building21) Completing The Structural Elements With Concrete Of The Front Façade.22) Cleaning And Anti-Corrosion Protection Of The Reinforcement Of Reinforced Concrete Elements.23) Filling The Gaps In The Reinforced Concrete Elements With The Application Of A Bond Layer24) Execution Of The Bond Layer25) Filling The Gaps And Leveling The Surface Of The Concrete Elements Of The Front Façade With Polymer-Cement Mortars Dedicated To Repairs Of Pcc Reinforced Concrete Structures26) Priming The Facade Surfaces27) Preparation Of Plaster Facade - Silicone/Silicate Structural Plaster28) Preparation Of A Plinth Made Of Resin Plaster29) In Places Of The Clinker Facade, Make A Cladding With Clinker Tiles (Imitation Brick)30) Installation Of Bumpers At The Entrance Gates 31) Removal Of A L
Contact Information
Address
43 Wojskowy Oddział Gospodarczy,Świętoszów,59-726,Dolnośląskie,Pl515 - Jeleniogórski
Email
43wog.szp@ron.mil.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117400800
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.