District-Heating Mains Construction Work - Development Of A District Heating Service System In Kaba. Development Of A District Heat Service System For Public Institutions Using Geothermal Energy In The Administrative Area Of The City Of Kaba As Follows: Energetic Development Of The Kabai Spa By Drilling A New Thermal Well And Utilizing Thermal Heat For Public Buildings By Building A District Heating Network And Heat Center. A 300 Kw Thermal Heat Utilization Block To Be Installed Next To The Open Hot Water Well, The Heat Produced By It Supplies The Following Local Government Institutions With District Heat Via A Transmission Line: - Workers Hostel: 4183 Kaba, Hrsz: 1671, Which Is Connected To The Network Via The 302 Fm Pre-Insulated Plastic Flexible Cable Pair Backbone And A 10 Fm Pair Of Cables Installed In A Common Jacket Pipe. - Új Bölcsőde: 4183 Kaba, Hrsz: 1676, Which Is Connected To The Main Backbone Network By A Pair Of Wires Installed In A Common Jacket Pipe Of 77 Fm. - Napközi Konyha: 4183 Kaba, Hrsz.: 1688, Which Is Connected To The Network Via A 45 Fm Pre-Insulated Plastic Flexible Wire Pair Backbone And A 46 Fm Pair Of Wires Installed In A Common Jacket Pipe. - Hétszínvirág Kindergarten: 4183 Kaba, Hrsz: 2141, Which Is Connected To The Main Backbone Network By A 196 Fm Pair Of Wires Installed In A Common Jacket Pipe. - Fire Department: 4183 Kaba, Hrsz: 1677/1, Which Is Connected To The Main Backbone Network By A 54 Fm Pair Of Wires Installed In A Common Jacket Pipe. - Napsugár Óvoda: 4183 Kaba, Hrsz.: 186/1, Which Is Connected To The Main Backbone Network By A 120 Fm Pair Of Wires Installed In A Common Jacket Pipe. - Támasz Social Basic Service Center New Building Wing: 4183, Kaba, Hrsz: 4, In Which Extension Building A Separate Heat Utilization Block Will Not Be Installed, But Will Be Supplied From The Old Building Unit At The Same Address With A Secondary Side Supply. The Starting Point Of The Power Supply Starts From The Heat Utilization Block On The Ground Floor Of The Old Building, The Arrival Point Of The Line Pair Is The Boiler Room On The First Floor Of The Extension. The Depth Of The Hot Water Well Is -1200 M, Its Planned Filtration Is Between -1180 And -1000 M, The Water Demand From The Well Is 700 L/Min, The Temperature Of The Extracted Water Is 65-70 Oc. The Laying Of Transmission Lines At A Depth Of 0.7-2.5 M, With Controlled Drilling At Several Points, Under Professional Supervision, And The Crossing Of Several Public Utilities Is Expected. A New District Heat Block Heat Center Suitable For District Heat Supply Will Be Built At Each Implementation Site, Which Will Include The Necessary Heat Exchangers, Pumps, Control Elements And Heat Consumption Meters. The District Heating System Is Connected To The Existing Heating Systems Of The Buildings Through The Blocks. The Total Heat Output From The Hot Water Well Is 300 Kw. Connection Of The Secondary Side Of The District Heating Blocks Of The Supplied Institutions To The Existing Heating Network Of The Institutions. The Connection Of Mechanical Equipment To The Existing Electrical Network Of The Buildings, As Well As The Installation Of A Separate Automatic Control System For Each Building, Which Is Connected Via A Common Gsm Communication System (With Ddc Controllers And The Creation Of A Web Server) During The Construction Period, The Implementation Of Technical Traffic Restrictions In Consultation With The Investor, The Restoration Of Road Closures C Load O
Contact Information
Address
Piac Utca 54
Contact No.
+36 302896226
Email
kozbeszerzes@ph.debrecen.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117392957
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.