|
Quotation Are Invited For Fabrication And Supply Of Aluminum Plates For E-Phase 1 Auxiliary Boiler Agitator (06 Nos). 1. Scope Descriptionfabrication, Supply, And Delivery Of 06 Nos Aluminium Plates For E-Phase1 Auxiliary Boiler Agitator, As Per The Sample Provided By Dewa Andverified Dimensions. The Existing Plates Are Cracked And Damaged Andrequire Replacement. The Replacement Plates Shall Match The Originaldimensions, Configuration, And Fitment Requirements. Based On Thesupplied Sample And Sketch, The Comp Onent Is A Circular Aluminiumagitator Mounting Plate. The Provided Images Show The Cracked Existingplate And Dimensional Sketch Used For Fabrication.2. Scope Of Work1.#Vendor Shall Inspect The Existing Aluminium Plate Sample Provided Bydewa And Verify All Dimensio Ns Before Fabrication.2.#Fabricate 06 Nos Aluminium Plates Identical To The Existingcomponent In Dimensions, Profile, Mounting Arran Gement, Bore Sizes, Holelocations, Recesses, And Functional Requirements.1.#Vendor Shall Verify And Reproduce All Dimensions, Includ Ing Outsidediameter (Od), Thickness, Centre Bore, Hole Diameters, Hole Locations,Pitch Circle Diameter (Pcd), Recesses, And Mating S Urfaces As Per Thesample Provided By Dewa.2.#The Material Shall Be Aluminium Alloy Equivalent To Or Better Thanthe Existing Componen T And Suitable For The Intended Service Conditions.3.#All Machining Operations Shall Be Carried Out To Achieve Accuratedimensions, C Oncentricity, Alignment, And Surface Finish.4.#All Mounting Holes, Centre Bore, Recesses, And Mating Surfaces Shallbe Accurately Mac Hined To Ensure Proper Installation And Fitment.5.#Burrs, Sharp Edges, Machining Fabrication Of Eachplate.3.#Dewa Reserves The Right To Inspect And Verify Dimensions Beforefi Nal Acceptance.4.#Any Non-Conforming Plate Shall Be Repaired Or Replaced By The Vendorat No Additional Cost To Dewa.4. Documentation Requirementsvendor Shall Submit:·#Material Test Certificate (Mtc)·#Certificate Of Compliance (Coc)·#Dimensional Inspection Report·# Fabrication Records·#Photographic Records·#Delivery Note·#Work Completion Report5. Dewa Scope1.#Dewa Shall Provide The Existing Samp Le Plate For Dimensional Verification. 2.#Dewa Shall Provide Access For Inspection And Measurement Whererequired.3.#Dewa Shall Review Dimensional Clarifications If Required Duringfabrication.6. Warranty1.#The Fabricated Aluminium Plates Shall Be Warranted For 12 Mon Thsfrom Installation Or 18 Months From Delivery, Whichever Occurs First.2.#The Warranty Shall Cover Material Defects, Workmanship De Ficiencies,Dimensional Inaccuracies, Fabrication Defects, And Premature Failuresattributable To The Supplied Components.3.#During Th E Warranty Period, The Vendor Shall Repair Or Replacedefective Plates At No Additional Cost To Dewa.Equipment Details (Reference)·#E Quipment: E-Phase 1 Auxiliary Boiler Agitator·#Component: Aluminium Agitator Plate·#Quantity: 06 Nos·#Approximate Od: 160-160.5 Mm·# Approximate Pcd: 130-131 Mm·#Thickness: 9 Mm·#Center Bore: Ø32 Mm·#Mounting Holes: 4 Nos Ø9 Mm·#Internal Holes: 3 Nos Ø6 Mm Qty: 6 Fabrication And Supply Of Aluminum Plates For E-Phase 1 Auxiliary Boiler Agitator (06 Nos) Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332602083)/$Value
|