On Plots No. 760, 989, 984 Along Konwaliowa Street, It Is Planned To Build A Bicycle Path Along With Hardening Part Of The Existing Exit From Bolesława Chrobrego Street (District Road: Plot No. 797) And Road Lighting. The Investment Consists Of 2 Sections Of A Bicycle Path With A Total Length Of 705.20 M And Hardening Of Part Of The Exit From The District Road. The Following Scope And Parameters Are Planned For The Cycle Path Sections: Section 1 Length (M) 696.90, Surface - Concrete Cubes Width - 4.00 M Side Width (M) Including From 0+00.00 To 0+30.00 0.85-3.30 (Left Side) Including From 0+00.00 To 0+70.90 0.50 (Right Side) Including From 0+70.00 To 6+96.90 0.85 (Left Side) 1.00 (Right Side) Road Surface Topsoil Covered With Grass Bicycle Path Border Concrete Inrun Curb 15X22x100 Section 2 Length 8.30 M Surface Concrete Cubes Width 4.00 M Path Border Bicycle Ramp Concrete Curb 15X22x100 A Road Surface Made Of Concrete Cubes Is Planned For The Path Being Built And The Hardening Of Part Of The Exit. The Road Is Designed With A One-Sided Slope. For Drainage Purposes, Transverse And Longitudinal Slopes Have Been Designed, Thanks To Which The Water Will Be Drained Into Green Areas Within The Road Right-Of-Way. The Sides Of The Bicycle Path Are Designed With A Formed And Compacted Layer Of Topsoil Covered With A Mixture Of Grass. List Of Plot Development Areas: - Area Of The Bicycle Path Road 2795.40 M2, - Area Of Exits From The Bicycle Path To Neighboring Streets Within The Kwiatowe Estate 54.50 M2, - Area Of Exit From The Street. Bolesława Chrobrego 51.60 M2, - Area Of Green Areas (Lawn) 1,380.00 M2, Electricity Network And Installation. The Following Facilities And Devices Are Planned In The Area Covered By The Study: - Lighting Poles Placed On The Foundation With Led Fixtures - Lighting Cable Lines - Securing The Existing Sn Cable Line With Protective Pipes. Power Supply Should Be Made From The Existing Lighting Pole On Div. 797. During Construction And Maintenance Works, Measures Should Be Taken To Reduce Noise, Dust And Pollution Emissions. Ii. At Least 70% (By Weight) Of Non-Hazardous Construction And Demolition Waste (Excluding Naturally Occurring Materials Referred To In Category 17 05 04 On The European List Of Waste Established In Decision 2000/532/Ec) Generated On The Construction Site Is To Be Diverted To Reuse, Recycling And Other Material Recovery Processes (Such As Backfilling Using Waste Substituting Other Materials), In Accordance With The Waste Hierarchy And The Protocol Eu Regulation On The Management Of Construction And Demolition Waste (Https://Ec.Europa.Eu/Growth/Content/Eu-Construction-And-Demolition-Waste-Protocol-0_En).Iii. Waste Generation From Construction And Demolition Processes Should Be Reduced, In Line With The Eu Protocol On The Management Of Waste From Construction And Demolition (Https://Ec.Europa.Eu/Growth/Content/Eu-Construction-And-Demolition-Waste-Protocol-0_En) And Taking Into Account Best Available Techni
Contact Information
Address
Gmina Małomice,Małomice,67-320,Lubuskie,Pl432 - Zielonogórski
Contact No.
+48683769027
Email
urzad@malomice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117271812
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.