Dease Lake - Fm Backup Generator Replacement . Review The Existing Emergency Power System, Generator, Ats, Fuel System, Electrical Distribution, And Associated Infrastructure. • Confirm Existing And Future Emergency Power Requirements And Validate Generator Sizing. • Assess And Recommend The Preferred Generator Location And Installation Approach. • Evaluate Options For A Packaged Outdoor Enclosure Or Purpose-Built Generator Room. • Assess The Existing Fuel Storage System And Determine Suitability For Reuse. • Review Existing Bas And Remote Monitoring Interfaces And Develop Requirements For Integration With The New Generator System. • Develop Coordinated Architectural, Structural, Mechanical, Electrical, And Controls Design Documents. • Develop Requirements For Temporary Emergency Power During Construction And Generator Replacement Activities. • Design Provisions For Future Auxiliary Generator Connection Serving Critical Facility Loads. • Prepare Drawings, Specifications, Tender Documents, Permit Submissions, And Cost Estimates As Required. • Define Testing, Commissioning, And Training Requirements. • Provide Contract Administration, Construction Support, Commissioning Oversight, And Record Documentation.
Contact Information
Contact Person
Emy Shaji
Email
Emy.Shaji@northernhealth.ca
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117169726
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.