Architectural, Engineering And Planning Services – Renovation Of A Leisure Pool In Reinbek - General Planning Services. Based On A Structural Analysis And A Feasibility Study, It Was Determined That Both The Structural Substance And Essential Parts Of The Technical Building Equipment And Pool Water Technology Have Reached The End Of Their Technical And Economic Useful Life. The Aim Of The Measure Is To Secure The Leisure Pool Location In The Long Term Through A Comprehensive Renovation Of The Existing Building, Taking Current Technical, Energy, Functional And Economic Requirements Into Account. The Subject Of The Project Is The Renovation Of The Existing Building Complex Within The Existing Building Stock. An Expansion Option That Was Also Examined In The Feasibility Study Is Not Part Of The Present Planning Task. The Renovation Measure Includes In Particular - The Renewal Of The Structural Facilities Including The Building Shell, - The Complete Renewal Of The Technical Building Equipment Including Heating, Ventilation, Sanitary, Electrical, Measurement, Control And Regulation Technology, - The Modernization Of The Bathing Water Technology, - The Energy Optimization Of The Building, - The Functional Reorganization And Modernization Of The Changing Rooms, Sanitary And Lounge Areas, - The Improvement Of Accessibility, - Measures To Increase The Quality Of Stay And - Ensuring A Economical And Sustainable Operation Over The Entire Life Cycle Of The System. The Project Is Characterized By The High Proportion Of Building Technology Systems As Well As The Complex Requirements For Pool Water Technology, Energy Efficiency, Building Physics And Operational Organization. Applicants Are Therefore Expected To Have Experience In Planning And Implementing Comparable Renovation Measures At Indoor And Leisure Pools. Particular Attention Must Be Paid To Economic Implementation In The Existing Building, Minimizing Life Cycle Costs, Optimizing Energy Consumption And Maintaining Long-Term, Economical Swimming Pool Operations. The Currently Estimated Investment Volume For The Construction Costs Is Around 12 Million Euros Gross. The City Of Reinbek Strives For Economical, Sustainable And Quality-Oriented Planning. The Existing Building Structures Should Be Preserved And Further Developed To The Extent That It Makes Technical And Economic Sense. At The Same Time, The Requirements For Energy Efficiency, Sustainability, Accessibility And Sustainable Swimming Pool Operations Must Be Taken Into Account. The Planning Services Should Be Awarded In Stages. Initially, The Commissioning Of Service Phases 1 To 4 Is Planned. We Reserve The Right To Continue To Commission Service Phases 5 To 9 In Stages; There Is No Legal Claim To This. A Construction Condition Analysis Was Carried Out For The Site In 2022 By The Companies Krieger Architekten Ingenieure, Velbert And Dtf Ingenieure Gmbh & Co. Kg, Velbert. In Addition, A Feasibility Study Was Carried Out Jointly By The German Sports Facility Management And P
Contact Information
Address
Hamburger Straße 5-7
Contact No.
040 70708070
Email
senger@luchterhandt.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117163717
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.