3.1. The Subject Of The Order In The Design And Build Formula Is: Creation And Retrofitting Of A Storage Base In The Stara Błotnica Commune, By Performing Construction Works Consisting In The Modernization Of Buildings After The Water Treatment Plant In Czyżówka In Order To Adapt Them To Storage Functions. Olioc - Construction Works. The Renovated Facility Is A Suw Building And Will Be Used In Such A Way, Therefore The Work Schedule Must Be Adjusted In Such A Way As Not To Interfered With The Functioning.3.2 Scope Of Works Of The Subject Of The Order: The Subject Of The Order Is The Comprehensive Reconstruction And Modernization Of An Existing Building, Consisting Of Two Warehouse Halls, Social And Technical Rooms And Connectors, In Order To Adapt It To The Functions Of A Civil Defense Warehouse (Olioc) Located In Czyżówka On Plot No. 140104_2.0002.12/1 And 140104_2.0002.14/1. The Property Has Active Water, Energy, Sewage And Telecommunications Connections And Is Equipped With Water, Sewage And Central Heating Installations. As Part Of The Task, The Following Construction Works Are Planned: 1) Insulation Of Ceilings With 140 Mm Pir Boards (Λ ≤ 0.023 W/Mk) Laid In Two Layers Staggered, Mechanically Attached To The Ground. Roof Covering Made Of Sbs Heat-Sealable Felt: Underlay Layer Pv S4.0 And Top Layer Pye Pv250 S5, 2. Leave The Existing Roofing Felt As A Vapor Barrier After Prior Preparation And Repairs.2) Replacement Of Windows And Doors3) Insulation Of External Walls Should Be Performed In The Etics System Using Eps 70-100 Thick Polystyrene Boards 15-20 Cm, Including The Construction Of The Facade With Silicone Plaster4) Insulation Of The Foundations5) Construction Of An Industrial Floor (Halls)6) Demolition Of The Floor (Halls)7) Replacement Of Floors (Background)8) Enlargement Of Technological Openings9) Construction Of 4X4 Insulated Industrial Gates10) Replacing A Central Heating Boiler11) Painting12) Bathroom Renovation13) Replacement Of Flashings Sheet Metal Work14) Disassembly And Installation Of The Pv Installation15) Disassembly Of Electrical Cabinets In The Suw Control Room16) Replacement Of Lighting With Led (Energy-Saving)17) Disassembly And Installation Of Video Monitoring (Cctv)18) Disassembly And Installation Of The Alarm System And Motion Sensors19) Installation Of Internal Doors 90 Cm20) Installation Of Internal Doors 120 Cm21) Installation Of Internal Doors 220 Cmgeneral Requirements1) Design Documentation Should Be Developed In Accordance With Common Technical Rules And Good Practices, With Regulations And Standards And Assuming That All Requirements Contained In This Opz Are Met, 2) The Design Documentation Must Be Prepared In A Manner Consistent With The Principles Of Modern Technical Knowledge, Applicable Regulations, Including Technical, Construction And Environmental Protection Regulations, 3) The Design Documentation Must Be Prepared In A Complete State From The Point Of View Of The Purpose It Is To Serve, 4) The Docume
Contact Information
Address
Gmina Stara Błotnica,Stara Błotnica,26-806,Mazowieckie,Pl921 - Radomski
Email
gmina@starablotnica.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117056602
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.