|
Airfield Pavement Construction Work – Rwy 13R/31L Runway End Renovation Works. The Purpose Of The Construction Task Is To Improve The Technical Condition Of The Thr 31L Area, As Well As The Taxiways Twy A1, Twy A2, Twy C And Twy D, As Well As Within Their Safety Zone, To Increase Capacities, To Widen The Load-Bearing And Bench Surface, To Renovate The Existing Infrastructures (Mainly Lighting And Rainwater Drainage Substructures), To Ensure Compliance With Applicable International And Domestic Regulations - Especially With Regard To 139/2014/Eu To The Provisions Of The Csadr-Dsn Regarding Airport Infrastructure Requirements - Taking Traffic Needs Into Account, In Accordance With The Customers Sustainability Strategy. Part Of The Task Is The Widening Of The Asphalt And Concrete Pavement Of The Taxiways, The Construction Of A New Load-Bearing Surface Approx. On A Surface Of 44,640 M2, Of Which 20,234 M2 Is Basalt Concrete Pavement, The Demolition Of The Existing Asphalt Pavement And The Widening Of The Pavement With The Construction Of A New Pavement, With Asphalt Pavement Approx. On An Area Of 27,190 M2. In Addition, The Construction Of A Primary Light Technical Substructure With A Length Of 91,000 Sq.M., Construction Of A Secondary Light Technical Substructure With A Length Of 15,800 Sq.M., As Well As The Construction Of A Ridge Track Of 1,153 Sq.M. Smaller Than Dn600 Diameter And 535 Sq.M. Larger Than Dn600 Diameter. In The Entire Intervention Area, Both The Edge Of The Load-Bearing Cover And The Bench Cover Must Be Widened In Accordance With The Movement Geometry Of The Standard Aircraft (Code E On Straight Sections, Code F On Curves). The Construction Work Must Be Carried Out Taking Into Account The Applicable Legal Regulations, International And Domestic Aviation Authority Regulations - Especially The Easa Regulations -, Standards, Directives And Permits And Observing The Provisions Laid Down Therein. A More Detailed Functional Description Of The Task To Be Performed And Itemized Tasks Are Included In The Public Procurement Documents. 321/2015. In View Of The Provisions Of § 46, Paragraph (3) Of The Government Decree (Hereinafter: 321/2015 Cr.), The Contracting Authority Draws Attention To The Fact That If A Clear And Comprehensible Definition Of The Subject Of The Public Procurement Made It Necessary To Refer To A Thing Of A Specific Make, Origin, Type, Process, Activity, Person, Patent Or Trademark, The Designation Was Made Only In Order To Clearly Define The Nature Of The Object, And In Addition To The Designation, The Or Equivalent Is Understood In All Cases. Proof Of Equivalence Is The Responsibility Of The Winning Bidder, As Specified In The Public Procurement Documents. Option - Demolition Of The Existing Gutter Almost Parallel To The Axis Of Twy C And Replacing It With A Grid Gutter In The Area Of The Twy D Taxiway And The Concrete-Paved Section Of The Twy D Taxiway Included In The Construction Plans, The Implementation Of Concrete Slab Replacements In The Entire Area And The Completion Of The Associated Modified Lighting Technical Tasks; - Soil Replacement Made From Broken Concrete Provided By The Customer; - Soil Replacement Made From Sand Gravel With Appropriate Certification From An External Mining Site
|