Part 1 - Implementation Of Construction Works In The Field Of Construction, Modernization And Replacement Of Network Lighting In The Pierzchnica Commune Based On The Available Design Documentation, Including: 1. Construction Of A Section Of A 0.4 Kv Low-Voltage Power Line For Road Lighting In The Town Of Skrzelczyce: • Connection With An Aluminum Cable Of The Asxsn2x25mm2 Type From The Existing Pole No. 7 Of The Skrzelczyce X Overhead Line To The Designed Pole No. 7/2, 90 (96) M2 Long. Reconstruction Of District Road No. 1344T, Ul. Kościelna In Pierzchnica, Consisting In The Construction Of A Road Lighting Cable Line: • Connection With An Aluminum Cable Type 4X35mm2 - Length 184 (202) M From The Existing Street Lamp Powered By The Lv Network Pierzchnica 3 To The Designed Street Lamp L_5.3. Construction Of A Road Lighting Line On The Existing Lv Hall Pierzchnica Health Center In Pierzchnica:• An Asxsn 2X25 Mm2 Cable Should Be Suspended From Pole No. 43 To Pole No. 43/1. Cable Stresses 42.5 Mpa; Cable Length Asxsn 4X25 Mm2 30 M; A 40W Led Luminaire Or Equivalent Should Be Installed On Pole No. 43/1.4. Construction Of Road Lighting On Existing Lv Networks In Drugnia-Parcela, Podlesie, Pierzchnica:• Construction Of Street Lighting On Poles: Pole No. 12 - Drugnia Ii Zakarczmie; No. 7 – Podlesie 1; Pole No. 8,17,21,25 – Podlesie 3; Pole No. 32 - Pierzchnica.5. Construction Of A Road Lighting Line On The Existing Lv Network Podlesie Ii In Podlesie:• An Asxsn 2X25 Mm2 Cable Should Be Suspended From Pole No. 11 To Pole No. 11/2. Cable Stresses 42.5 Mpa; Asxsn Cable Length 4X25 Mm2 57 M; A 40W Led Luminaire Or Equivalent Should Be Installed On Pole No. 11/2.6. Construction Of A Road Lighting Line On The Existing Lv Network Of Straszniów Gumienicki In The Town Of Straszniów Gumienicki:• An Asxsn 2X25 Mm2 Cable Should Be Suspended From Pole No. 40 To Pole No. 47. Cable Stresses 42.5 Mpa; Asxsn Cable Length 4X25 Mm2 52 M; A 40W Led Luminaire Or Equivalent Should Be Installed On Pole No. 47.7. Construction Of A Road Lighting Line On The Existing Lv Network Of Straszniów Gumienicki In The Town Of Straszniów Gumienicki:• An Asxsn 2X25 Mm2 Cable Should Be Suspended From Pole No. 20/2 To Pole No. 20/3. Cable Stresses 42.5 Mpa; Asxsn Cable Length 4X25 Mm2 27 M; A 40W Led Luminaire Or Equivalent Should Be Installed On Pole No. 20/3.
Contact Information
Address
Gmina Pierzchnica,Pierzchnica,26-015,Świętokrzyskie,Pl721 - Kielecki
Contact No.
413705600
Email
inwestycje@pierzchnica.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116997170
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.