|
1.1.1. Part 1: Task No. 3 - Thermal Modernization Of A Residential Building At Ul. Mickiewicza 5 In Ełk, The Subject Of The Order Is The Thermal Modernization Of A Residential Building At Ul. Mickiewicza 5 In Ełk. Construction Works Will Be Carried Out On An Active Residential Building. The Building Is Under Conservation Protection. The Scope Of The Order Includes Thermal Modernization Of The Building With A Usable Area Of 561.43 M2: A) Development And Approval Of A Project For Temporary Traffic Organization For The Duration Of The Works, Along With A Fee For The Temporary Occupation Of This Lane. Construction And Maintenance Of Access And Detour Roads For The Duration Of The Works And Restoring The Area To Its Original Condition. B) Maintaining Documentation Of The Course Of Conservation Works, By Authorized Persons, In A Way That Enables Clear Identification And Precise Spatial Location Of All Activities, Materials Used And Discoveries Made, C) Leveling The Area Around The Building, Including Removal And Disposal, D) Execution Of Earthworks, E) Execution Of Demolition Works, Including Removal And Disposal Disposal, F) Disassembly And Reassembly Of Small Elements Mounted On The Facade, I.E.: Antennas, Boards, Etc. G) Insulation Of The Underground Walls Against Moisture, H) Insulation Of The Building, Including: Insulation Of The Ceilings, Flat Roof, Insulation Of The Underground And Above-Ground Walls Along With Painting, I) Renovation Of The Facade By Blast Cleaning Of Bricks, Reconstruction Of Brick Plinths, Repair Cracks, Grouting Of Joints, Hydrophobization Of Walls And Replacement Of External Plasters With Thermal Insulating Plasters,J) Reconstruction Of Window Wells,K) Replacement Of Window Frames Together With The Processing Of Jambs (Warm Assembly), L) Replacement Of External And Internal Window Sills, M) Replacement Of Door Frames Together With The Processing Of Jambs,N) Replacement Of Roofing Together With The Replacement Of Flashings Sheet Metal Work, O) Insulation Of Chimneys, P) Replacing The Band Around The Building Made Of Granite Cubes. 6 Cm Surrounded By Granite Edges, Q) Construction Of Quite Pedestrian Areas With A Surface Made Of Concrete Cubes. 6 Cm Surrounded By Concrete Edges 6X20 Cm, R) Construction Of Stairs With A Surface Made Of Concrete Cubes. 6 Cm Surrounded By Concrete Edges 8X30 Cm With A Steel Handrail, S) Replacing The Lightning Protection System With A New One, T) Restoring Damaged Or Devastated Walls, Ceilings, Floors, Hardened Surfaces And Green Areas To Their Original Condition After Construction Works, U) Cleaning The Area After Construction Works, V) Preparing As-Built Documentation In Two Copies (One Set In Paper Version, The Other Set In Digital Version On An External Data Carrier), Including, Among Others: - Temporary Traffic Organization Design, - Study Of The Course Of Conservation Works, - Statements Of The Construction Manager And Work Managers, - Reports On Tests And Measurements Carried Out Durin
|