4.1. The Subject Of The Order Are Construction Works On The Investment Project Titled: Expansion Of The Sanitary Sewage System In The Towns Of Kopki, Przędzel And Przędzel Kolonia - Stage I. 4.2. Scope Of The Subject Of The Order: 4.2.1. Extension Of The Sanitary Sewage System In The Towns Of Przędzel And Przędzel Kolonia - Stage I: 4.2.1.1. Sanitary Industry:1) P1 Catchment Area:• Gravity Sewerage: Earthworks And Preparatory Works, Installation Of Pipelines, Inspection And Sewage Wells, Execution Of A Horizontal Drilling Under The District Road,• Pressure Sewerage: Earthworks And Preparatory Works, Installation Of Pipelines, Construction Of A Horizontal Drilling Under The District Road,• Construction Of A P1 Sewage Pumping Station Along With The Necessary Technical Infrastructure: - Earthworks And Preparatory Works, - Assembly Works, - Construction Of A Fence And Hardening Of The Area, • Drainage Of Excavations: - Drainage Of Excavations During Linear Earthworks, - Drainage Of Excavations During Earthworks For The Foundation Of The Pumping Station, • Demolition And Surface Reconstruction Works, • Other Works Necessary For The Proper Execution Of The Task (Including The Execution Of Surveying Post-Construction Inventory).2) Catchment P2:• Gravity Sewerage: Earthworks And Preparatory Works, Installation Of Pipelines, Inspection And Sewage Wells, Execution Of Horizontal Drilling Under The District Road,• Pressure Sewerage: Earthwork And Preparatory Works, Installation Of Pipelines, Execution Of Horizontal Drilling Under The District Road,• Construction Of A P2 Sewage Pumping Station Along With With The Necessary Technical Infrastructure: - Earthworks And Preparatory Works, - Assembly Works, - Construction Of A Fence Along With Hardening The Area, • Drainage Of Excavations: - Drainage Of Excavations During Linear Earthworks, - Drainage Of Excavations During Earthworks For The Foundation Of The Pumping Station, • Demolition And Surface Reconstruction Works, • Other Works Necessary For The Proper Performance Of The Task (Including Execution Post-Construction Surveying Inventory).3) P16 Catchment Area:• Gravity Sewage System: Earthworks And Preparatory Works, Installation Of Pipelines And Sewage Wells, • Pressure Sewage System: Earthworks And Preparatory Works, Installation Of Pipelines, Execution Of A Horizontal Drilling Under The River,• Construction Of A P16 Sewage Pumping Station Along With The Necessary Technical Infrastructure: Works Earthworks And Preparatory Works, Assembly Works, Construction Of A Fence And Hardening Of The Area, • Drainage Of Excavations: – Drainage Of Excavations During Linear Earthworks, – Drainage Of Excavations During Earthworks For The Foundation Of The Pumping Station, • Demolition And Surface Reconstruction Works, • Other Works Necessary For The Proper Performance Of The Task (Including The Preparation Of A Geodetic Inventory Post-Construction).4) P17 Catchment Area:• Gravity Sewerage: Earthworks A
|