|
Electrical Wiring And Fitting Work – Saen.4003 - Electrical Engineering Construction Section 3.2. Pumping Station Sand I: • 1 Energy Distribution Local Network/Pump Control, Ub = 400 V, • 1 Slide And Level Cabinet, Ub = 400 V, • Level Measurements, • Electrical Installation, • 1 Emergency Power Supply Ub = 400 V, • El. Connection And Cabling Of Control Cabinets And Electrical Consumers (Slide Drives) And Flood Pumps, • Potential Equalization, • Planning, Documentation, Risk Assessment, Ce Declaration Of Conformity, • Commissioning, Commissioning, Operator Instruction. Sand Ii Pumping Point: • 1 Energy Distribution Local Network/Slide And Level Cabinet, Ub = 400 V, • Electrical Installation, • 1 Emergency Power Supply Ub = 400 V, • El. Connection And Cabling Of Control Cabinets And Electrical Consumers (Slide Drives), • Device For Connecting Mobile Flood Pumps, • Potential Equalization, • Planning, Documentation, Risk Assessment, Ce Declaration Of Conformity, • Commissioning, Commissioning, Operator Instruction. Siel Asham: • 1 Energy Distribution Local Network, Ub = 400 V, • 1 Slide And Level Cabinet, Ub = 400 V, • Electrical Installation, • 1 Emergency Power Supply Ub = 400 V, • El. Connection And Cabling Of Control Cabinets And Electrical Consumers (Slide Drives), • Potential Equalization, • Planning, Documentation, Risk Assessment, Ce Declaration Of Conformity, • Commissioning, Commissioning, Operator Instruction. Asham Pumping Point: • 1 Energy Distribution Local Network/Slide And Level Cabinet, Ub = 400 V, • Electrical Installation, • 1 Emergency Power Supply Ub = 400 V, • El. Connection And Cabling Of Control Cabinets And Electrical Consumers (Slide Drives), • Device For Connecting Mobile Flood Pumps, • Potential Equalization, • Planning, Documentation, Risk Assessment, Ce Declaration Of Conformity, • Commissioning, Commissioning, Operator Instruction. Hunderdorf Pumping Point: • 1 Energy Distribution Local Network, Ub = 400 V, • Electrical Installation, • 1 Emergency Power Supply Ub = 400 V, • El. Connection And Cabling Of Control Cabinets, • Device For Connecting Mobile Flood Pumps • Potential Equalization, • Planning, Documentation, Risk Assessment, Ce Declaration Of Conformity, • Commissioning, Commissioning, Operator Instruction
|