|
Painting Work Of Buildings – Ve 67.1 - Painting Work Level 0, Complete Renovation Of Potsdam Town Hall, 14469 Potsdam. Ve 67.1 Painting Work Level 0: Securing: Approx. 2,000 M2 Components Protect Approx. 3,300 M2 Cover Floor Areas Approx. 300 Pieces Cover Radiators Demolition Painter: Approx. 100 M2 Wallpaper Remove Walls, Ceilings And Soffits Approx. 750 Pieces Remove Dowels, Wooden Blocks, Nails And Hooks Preparatory Work: Approx. 1,800 M2 Of Existing Coating, Sand The Inside Of The Walls, Approx. 4,500 M2, Remove Old Coating, Approx. 1,500 M2 Of Old Coating, Remove Oil, Approx. 10,400 M2 Plastered Areas Q3 100% Filled Approx. 1,700 M2 Plastered Areas Partially Filled Approx. 1,250 M Soffits Filled Approx. 300 M2 Supports Filled Approx. 3,400 M2 Ceiling Area And Joists Filled Approx. 1,900 M Ceiling Valley Filled Approx. 500 M2 Primer Ceilings Drywall Approx. 10,400 M2 Primer Wall Surface Plaster Approx. 1,250 M Primer Soffit Plaster Approx. 300 M2 Primer Supports Approx. 2,900 M2 Primer Ceilings, Approx. 2,500 M Primer Ceiling Valley Approx. 500 M2 Primer Vaulted Ceilings Approx Insulating Paint, Walls Approx. 200 M2 Insulating Paint, Ceilings Wallpapering Work Painter: Approx. 400 M2 Painters Fleece Drywall Walls Approx. 1,000 M2 Painters Fleece Plastered Surfaces Walls Approx. 1,000 M2 Painters Fleece Ceilings Plaster Coating: Approx. 1,100 M Coating Of Reveals Approx. 300 M2 Coating Of Supports Approx. 2,800 M2 Coating Of Ceilings Plaster Approx. 2,500 M Of Coating Of Ceiling Valley Approx. 470 M2 Of Coating Of Vaulted Ceiling Approx. 1,000 M2 Of Allowance Medium Tint Approx. 1,000 M2 Of Allowance Of Rich Tint Approx. 380 M Of Coating Of Stucco Moldings Approx. 120 M2 Of Coating Concrete Floors Epoxy Resin Approx. 2,500 M Coating Heating Pipes Approx. 190 Pieces Coating Cast Fins Radiators Approx. 12,500 M Acrylic Approx. 3,200 M Coating Skirting Boards
|