Tenders Are Invited For Transformer Substation – New Construction 380Kv Air-Insulated Switchgear For The Con ... in Germany
Tender Notice
TenderID
116988524
Tender Brief
Tenders Are Invited For Transformer Substation – New Construction 380Kv Air-Insulated Switchgear For The Connection Of Battery Storage Systems As A General Contractor
Transformer Substation – New Construction 380Kv Air-Insulated Switchgear For The Connection Of Battery Storage Systems As A General Contractor. As Part Of Grid Connection Requests, Several Measures Were Required To Be Implemented To Connect Three Grid Petitioners To The 380Kv Transnetbw Grid At The Pulve Site. This Includes The Construction Of A 380Kv Air-Insulated Switchgear Of The Tbw Class “Small System”. The Switchgear Consists Of A Double Busbar, A Coupling And Seven Switch Panels. The Two Circuits 8045 Blue Mühlhausen-Pulverdingen And 8021 Red Großgartach C2 Pulverdingen Are To Be Looped In Via These Switch Panels. With Regard To The Rated Data And The Quantity Structure For Future Requirements, The Expansion Of The Existing 380 Kv Switchgear According To The Current Transnetbw Standard Is Not Possible. Therefore, The Measures Can Only Be Implemented By Building A New Air-Insulated 380 Kv Switchgear With A Company Building. This Order Includes The Following Deliveries And Services For The Systems Described Below: - Complete Planning Taking Into Account All Project Requirements Including All Requirements, - Design, Calculation And Construction, - Preparation Of All Evidence And Concepts, - Area Security - Preparation And Submission Of Approval Documents - Manufacturing, Tests And Examinations, - Delivery, Packaging, Insurance And Transport Free To The Point Of Use, - Unloading, Interim Storage, Construction Site Transport, - Construction Site Equipment, - Dismantling, Storage Or Disposal, - Assembly And Erection, - Cleaning And Corrosion Protection, - Assembly Supervision, - Acceptance, - Commissioning (Ibs), - Ready-To-Use Handovers (Bbü), - Preparation And Participation In Functional Tests (Fup) Carried Out By The Client, - Training And Documentation. - Cable Entry Including Approval For Air-Insulated Switchgear 380 Kv Consisting, Among Other Things: - 2-Fold Busbar System - 4 Line Switch Panels With Looping In Of The Circuits Mentioned Under 1.2 - 3 Line Switch Panels For Connecting Network Customer Systems - Coupling Field - Secondary Technology For 7 Fields - Additional Area For 2 Fields (Renewal Reserve) - Own Use - System Infrastructure - Operational Building - Relay Houses For The 380 Kv-Ais Switch Panels And Busbar Clarification: The Contractor Is Responsible For The Turnkey Handover And Proper Functioning Of The Substation. The Services Listed Here Only Represent A Rough Overview And Do Not Relieve The Contractor Of His Obligation To Take Into Account Any Services Necessary For The Operation/Function. Access To The Order Documents Is Restricted. Please Register On The Purchasing Platform Https://Transnetbw.Synertrade.Com After Registration, Please Contact Eu-Ausweisung@Transnetbw.De There You Will Receive Further Information. If You Have Technical Problems Or Questions, Please Contact Eu-Ausscription@Transnetbw.De Offers Or Applications For Participation Must Be Submitted Electronically Via: Https://Transnetbw.Synertrade.Com
Contact Information
Address
Osloer Straße 15-17
Contact No.
+49 151 62770773
Email
eu-ausschreibung@transnetbw.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116988524
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.