|
Engineering Design Services - Development Of Design Documentation For The Reconstruction Of Malinowa And Sadowa Streets, Including Performing Authors Supervision At The Stage Of Implementation Of The Investment As Part Of The Investment Task Pn. Słupsk Road Development Program.. The Subject Of The Order Includes In Particular: 1. The Design Study Concerns: 1) The City Of Słupsk, Plot No.: 56/4 Rev. 4 - Ul. Owocowa (Municipal Road No. 116173G), 128 Rev. 4 Ul. Malinowa (Municipal Road No. 116132G), 88/2 Rev. 4 Ul. Sadowa (Municipal Road 116210G), Total Length Approx. 960 M, (If It Is Necessary To Enter The Boundaries Of Plots Not Listed Above, The Contractor Is Obliged To Include These Plots In The Study And Obtain The Necessary Arrangements), 2) Location Indicated On The Map - Annex No. 12 To The Swz. 2. Br. Road: 1) Ul. Malinowa: A) On Episode Approx. 260 M, Construction Of A 5.5 M Wide Bituminous Road With Road Construction Layers, B) On The Section Approx. 305 M, Construction Of The Sidewalk Along With The Sidewalks Structural Layers, Sidewalk Surface Made Of Concrete Cubes. Gray In Color, The Surface Of The Exits Is Made Of Concrete Cubes. Graphite Color, C) In Section Approx. 340 M Construction Of A 5.0 M Wide Road Made Of Concrete Cubes In The Residential Zone Along With The Road Construction Layers, D) Identification Of The Subsoil, Including Ground Tests, E) Adaptation Of The Structure And Road Surface To The Forecast Traffic Load And Ground Conditions (Calculation Of Traffic Categories, Proposing The Structure Of The Road Surface, Intersections, Exits, Etc.), F) Solving Possible Collisions With External Infrastructure, Including In The Event Of If Necessary, Development Of A Collision Removal Project, G) Preparation Of A Permanent Traffic Organization Project With Approval By The Authority Responsible For Road Traffic Management, 2) Ul. Sadowa: A) Along Ul. Sadowa Construction Of A Road With A Width Of 4.5 M Made Of Concrete Cubes In The Residential Zone Along With The Construction Layers Of The Road, B) Identification Of The Subsoil, Including Carrying Out Soil Tests, C) Adaptation Of The Structure And Road Surface To The Forecast Traffic Load And Ground Conditions, D) Solution Of Possible Collisions With External Infrastructure, Including, If Necessary, Development Of A Collision Removal Project, E) Preparation Of A Permanent Traffic Organization Design With Approval By The Authority Competent For Road Traffic Management, 3. Br. Sanitary: 1) Ul. Malinowa: A) Construction Of A Rainwater Canal With Sewage Wells In The Section. Street Malinowa And Construction Of Rain Inlets On The Entire Section Of Ul. Malinowa, In Accordance With The Technical Conditions Issued By Zim In Słupsk, Which The Contractor Will Apply For Before Commencing The Design Works, 2) Ul. Sadowa: A) Construction Of A New Storm Sewer Along The Entire Length Of The Street. Sadowa With Sewage Wells And Rainwater Inlets. Inclusion Of A New Storm Sewer Into The Existing Storm Sewage System Running Approx. 150-200 M From The Street. Sadowa, In Accordance With The Technical Conditions Issued By Zim In Słupsk, Which The Contractor Will Apply For Before Commencing The Design Works, 4. Br. Power Engineering Ul. Malinowa And Sadowa: 1) Relocation Of Existing Lighting In Accordance With The Technical Conditions Issued By Zim In Słupsk, Which The Contractor Will Apply For Before Commencing Design Work, 5. Br. Telecommunications
|