Architectural, Construction, Engineering And Inspection Services – General Planning Services. The Basis Of The Planned Measures Is Formed From The Following Specifications: 1. Development Plan 1-14 For The Redesign Of The Entire Area From 2015; 2. Development Plan 1-14-1 To Supplement Or Selectively Change The Development Plan 1-14 - This Is Expected To Become Legal In The Summer Of 2026; 3. Framework Plan For The Molkenmarkt Charter With The Development Guidelines In The Form Of Block And Building Profiles (Results From A Multi-Stage, Urban And Open Space Planning Qualification Process From 2020); 4. Results From The Implementation Competition For Architects For Block B1 - Divided Into Three Lots (Jury Jury November 2025; The Selection Of The Respective Property Planner For The Three Lots Is Expected To Take Place In The 4Th Quarter Of 2026 Through The Subsequent Vgv Procedures); 5. Results From The Implementation Competition For Architects For Blocks B2 And A1 - Divided Into Three Lots (Judging Panel June 2026; The Selection Of The Respective Property Planner For The Four Lots Is Expected To Take Place In The 1St Quarter Of 2027 Through The Subsequent Vgv Procedures); 6. Result From The Implementation Competition For Landscape Architects To Design The Courtyard Areas In Block B And A City Square In Block A (The Competition Is Still In Preparation; The Selection Of The Freiraum Property Planner Is Expected To Take Place In The 1St Quarter Of 2027 Through A Subsequent Vgv Process). After Carrying Out The Subsequent Vgv Procedures, It Is Ultimately Assumed That There Will Be Seven Different Property Planners (Possibly Partly As An Office Community Consisting Of Two To Three Offices) And One Open Space Planner. The Winning Bidders Or Bidding Groups In The Vgv Process Are Gradually Commissioned As Object Planners, In The Service Profile Of Buildings And Interior Spaces In Accordance With Hoai § 34 For The Service Phases (Lp) 1-3, Lp 4 In Parts (Elaboration Of The Approval Planning, I.E. In Particular Clarification Of The Approval Capability, Development Of Templates And Evidence), Lp 5 In Parts (Guiding Details) And Lp 8 In Parts (Artistic Overhead Line) And In The Performance Profile For Outdoor Facilities In Accordance With Hoai § 39 For The Service Phases (Lp) 1-3, Lp 4 In Parts (Elaboration Of The Approval Planning, I.E. In Particular Clarification Of Approval Eligibility, Development Of Templates And Evidence), Lp 5 In Parts (Guiding Details) And Lp 8 In Parts (Artistic Overhead Line). To Ensure That Cross-Lot Concerns (E.G. Energy Supply, Rainwater Management, Supply And Disposal, Securing A Sufficient Proportion Of Eligible Apartments, Etc.) Are Resolved Across Lots And To Ensure A Project With An Efficient Cost Structure Despite The Large Number Of People Involved (E.G. Uniform Construction, Joint Implementation Planning And Construction, Etc.), A General Planner Should Be Installed. The Subject Of The Planning Services To Be Awarded Is The General Planning For Both Blocks A +
Contact Information
Address
Dircksenstraße 38
Contact No.
+49 30 2471 3654
Email
vergabe@wbm.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116988415
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.