Tenders Are Invited For Construction Work For Power Plans – Framework Agreement For The Production, Operatio ... in Germany
Tender Notice
TenderID
116987468
Tender Brief
Tenders Are Invited For Construction Work For Power Plans – Framework Agreement For The Production, Operation, Maintenance, Adaptation And Dismantling Of A Construction Power Distribution Network Including Temporary Path And Area Lighting.
Construction Work For Power Plans – Framework Agreement For The Production, Operation, Maintenance, Adaptation And Dismantling Of A Construction Power Distribution Network Including Temporary Path And Area Lighting.. A New Sustainable Plant Park For Heat Generation Is To Be Built At The Hkw Klingenberg Site By 2030. To Supply The Associated Various Project Work At The Site, The Construction And Connection, Operation, Maintenance, Needs-Based Adjustment And Final Dismantling Of The Electrical Supply (Medium 6 Kv And Low-Voltage Systems 0.4 Kv) For The Required Construction Power Network As Well As The Construction And Connection, Operation, Maintenance, Needs-Based Adjustment And Final Dismantling Of The Temporary Lighting Are Being Put Out To Tender. Service Content: - Work And Assembly Planning To The Extent Of The Respective Call-Off - Production Of Cable Ducts/Trenchments, Excavation Pits, Including Ground Improvement And Building Constructions As Required - Delivery, Laying And Installation Of Cables (Electrical Medium-Voltage Level (6 Kv) And Low-Voltage Level (0.4 Kv)), Fiber Optic Conductors, Provision And Connection Of Transformers And Heavy-Duty Distributors, Including The Associated Grounding And Lightning Protection Measures As Well As All Tests And Documentation - Cleaning And Normative Testing Of Existing Stations (Transformers) For Recommissioning - Demand-Based Procurement, Provision And Connection Of New Transformer Stations And 0.4 Kv Distributors, Including Testing For Ibs - Implementation Of Transformers And 0.4 Kv Distributors As Part Of Adapting The Construction Power Network To Requirements, Including Electrical Connection - Delivery, Installation And Electrical Connection Of Temporary Lighting Systems, Including The Associated Ones Grounding, Overvoltage And Lightning Protection Measures As Well As All Tests And Documentation Note: The Interfaces To The Construction Power Network Are Defined By The Cable Ends Of The 6 Kv Feed Lines On The Cells Of The Switchgear In Base 3 (6 Kv Electrical Feed, Starting Point On The Company Premises) And By The Connection Terminals Of The Nh Outlet Strips In The 0.4 Kv Heavy-Duty Distributors (Sv, Destination Point). All Of The Aforementioned Activities Apply Within These Interfaces.
Contact Information
Address
Hildegard-Knef-Platz 2
Contact No.
+49 302670
Email
eu-vergabe@bew.berlin
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116987468
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.