|
Electrical Fitting Work – Electrical Installation Work, General. Westfriedhof, Baldurstrasse, General Renovation; Ve: Electrical Installation Work, General As Part Of The General Renovation Of The Listed Building Ensemble Of The Westfriedhof Munich, The Electrical Systems In The Historic Existing Buildings As Well As In The Subordinate New Building And Expansion Areas Must Be Completely Renewed. The Construction Project Includes The Renovation And Modernization Of Several Historical Parts Of The Building, Including The Blessing Hall, Arcades, Administration Building, Laying In State, Depot, Crypt As Well As Personnel And Functional Areas. The Entire Measure Is Carried Out Under The Supervision Of Monument Preservation. The Gross Floor Area Of The Building Complex Is Approximately 6,735 M². The Subject Of The Tender Is The Complete Reconstruction Of The Electrical Engineering Systems Including Delivery, Assembly, Commissioning, Testing And Documentation. The Existing Systems Are Dismantled On Site. The Scope Of Services Includes, In Particular, The New Installation Of High-Voltage Systems, The Construction Of New Installation Systems And Cable Systems, The Delivery And Assembly Of Main, Sub- And Area Distributors, The Installation Of Energy-Efficient Led Lighting Systems Including Security Lighting, The Construction Of Telecommunications And Data Networks, Door Intercom Systems, Grounding And Potential Equalization Systems As Well As All Necessary Fire Protection Measures. The Execution Is Mainly Carried Out In Listed Buildings With High Demands On Quality, Surface Protection And Construction Process Coordination. Construction Site Logistics Are Particularly Demanding Due To Limited Storage And Delivery Space And The Inner-City Location. Essential Services (Approx. Quantities) The Following Quantities Are For Guidance Only And Do Not Represent A Final Description Of Services: Installation Systems (Cable Routes, Installation Ducts, Pipes) Approx. 5,000 M Power Cables And Circuit Lines Approx. 35,000 M Telecommunications And Data Cables Approx. 8,000 M Main, Sub- And Area Distributors Approx. 25 Pieces Of Installation Devices (Switches, Sockets, Connection Boxes) Approx. 1,000 Pieces. Interior And Exterior Lights In Led Technology Approx. 700 Pieces St. The Tender Covers Several Building Areas (Housing, Administration, Crypt, Cemetery Operations As Well As Staff And Toilet Buildings) With The Respective System Groups.
|