|
1. The Subject Of The Order Is The Performance Of Design Works And Construction Works For The Investment Task Titled: Construction Of A Selective Municipal Waste Collection Point In The Panki Commune., In The Design And Build Formula, Located In Panki At Ul. Łąkowa 8B, 42-140 Panki, Including Delivery And Installation Of Equipment.1.1. The Project Will Involve The Design And Construction Of A Selective Municipal Waste Collection Point (Pszok), Where Municipal Waste From The Panki Commune, Delivered By Its Residents, Will Be Collected And Stored, Along With Designating A Place For The Exchange Of Used Items, Demolition, Repair, Reuse, And Additional Educational And Information Activities To Shape Ecological Awareness. The Total Area Of The Area Intended For Transformation In Connection With The Implementation Of The Project Is Approximately 2,000 M2, Including: Paved Areas For Road And Pedestrian Routes, Waste Storage, Containers And Waste Rooms, Social Rooms, Located In The Fenced Part Of The Planned Pszok; Open Area Of Pszok, Where It Is Planned To Construct Paved Pedestrian And Road Routes, Parking Spaces With A Weighing Point For Trucks And An Educational And Information Point, With Elements Of Small Public Architecture And Greenery Development.1.2. Investment Location: Plot With Registration Number 222/2, District 0011 Panki / Panki Commune.2. The Scope Of Work Covered By This Task Includes In Particular: 2.1. Design Documentation - Includes The Development Of Complete Design Documentation Based On The Functional And Utility Program And Data Contained In The Available Documents, Prepared In Accordance With Applicable Law, Necessary To Perform Construction And Assembly Works, Including In Particular: 1) Preparation Of A Land Development Design, Architectural And Construction Design, Technical Design Along With Obtaining A Building Permit Decision, / Notification Of Construction Or Execution Of Other Construction Works (In Accordance With The Requirements Of The Act Of July 7, 1994 R. - Construction Law) After Prior Agreement With The Ordering Party On Design Solutions; 2) Preparation Of An Executive Design; 3) Obtaining All Opinions, Arrangements And Decisions Required For The Implementation Of Construction Works; 4) Development And Approval On Behalf Of The Ordering Party Of Temporary And Permanent Traffic Organization (If Required); 5) Based On The Prepared Design Documentation, Development Of Technical Specifications For The Execution And Acceptance Of Stwiorb Works, Bioz Plan, Investors Cost Estimate Along With The Bill Of Quantities Of Works. Cost Estimates Will Be Prepared In Accordance With The Regulation Of The Minister Of Infrastructure Of December 20, 2021 On Determining The Methods And Basis For Preparing An Investors Cost Estimate, Calculating The Costs Of Design Works And Planned Construction Works Specified In The Functional And Utility Program (Journal Of Laws Of 2021, Item 2458).2.1.1. Conditions For Developing Design Documen
|