|
The Subject Of The Order Is The Reconstruction Of A Football Pitch With A Synthetic Grass Surface, Reconstruction Of A Multi-Purpose Pitch With A Polyurethane Surface, Construction Of Hardened Surfaces, Replacement Of Lighting Fixtures, Installation Of Monitoring Cameras, Fencing Of Sports Fields, Equipping The Facility With Modern Sports Equipment, Recreational Facilities - Table Tennis Tables And Supplementing The Infrastructure With Small Architectural Objects - Waste Bins. The Investment Involves The Reconstruction Of The Pitch Surface And Adapting The Facility To Current And Modern Standards. Standards, Increasing The Comfort Of Use Of The Facility And Expanding The Recreational Values And Making The Facility More Attractive To Users. It Is Planned To Replace The Fence, Lighting Fixtures And Sports Equipment On The Pitches. On The Analyzed Plot, The Facility Is Planned To Be Equipped With Table Tennis Tables And Small Architectural Objects, As Well As The Installation Of Monitoring Cameras. A Slight Hardening Of The Area Around The Football Pitch Is Also Planned. The Dismantled Objects, I.E. Lighting, Fencing, Ball Catches, Playground Equipment, Are To Be Handed Over To The Ordering Party. Elements That Cannot Be Re-Assembled Are Intended For Disposal By The Contractor. Quality Assurance Program (Qp). The Contractor Is Obliged To Develop And Submit A Quality Assurance Program For Approval To The Supervisory Inspector. In The Quality Assurance Program, The Contractor Should Specify The Intended Method Of Performing The Works, Technical And Staff Capabilities And A Work Organization Plan Guaranteeing The Execution Of The Works In Accordance With The Design Documentation, Sst And The Arrangements. The Quality Assurance Program Should Include: - Organization Of The Execution Of Works, Including The Dates And Method Of Carrying Out The Works, - Organization Of Traffic On The Construction Site Along With The Marking Of The Works, - Method Of Ensuring Occupational Health And Safety During The Works, - List Of Working Teams, Their Qualifications And Practical Preparation, - List Of Persons Responsible For The Quality And Timeliness Of Execution Of Individual Elements Of The Works, - System (Method And Procedure) Of The Proposed Control And Quality Control Of The Works Performed, - Equipment And Devices For Measurements And Control (Description Of The Contractors Own Laboratory Or The Laboratory Assigned To It By The Contractor). Intends To Commission Research), - The Method And Form Of Collecting Laboratory Test Results, Recording Measurements, Settings Of Control Mechanisms, As Well As Conclusions Drawn And Applied Corrections In The Technological Process, The Proposed Method And Form Of Transmitting This Information To The Engineer/Project Manager. A Detailed Description Of The Subject Of The Order Can Be Found In The Attached To The Swz - Annex No. 1 To The Swz, Consisting Of: A) Land Development Design (Pzt) B) Architectural And Construction Des
|