Tenders Are Invited For Modernization Of The Swimming Pool Hall In The Part Of The Recreational Pool And Con ... in Poland
Tender Notice
TenderID
116793505
Tender Brief
Tenders Are Invited For Modernization Of The Swimming Pool Hall In The Part Of The Recreational Pool And Construction Of A Paddling Pool With Water Attractions For Children
1. The Main Assumption Of The Planned Modernization Of The Swimming Pool Hall Is To Free And Transform Part Of The Recreational Pool Basin (Previously Serving As A Slide Dynamometer) For Recreation And Rehabilitation Purposes, Along With The Creation Of A New Water Attractions Zone For Children In The Form Of A Swimming Pool Paddling Pool.2. The Scope Of The Order Includes Comprehensive Dismantling And Demolition Works, Securing Technical Openings, Making New Brick Elements, Flooring And Finishing Works (Including Laying The Pool Foil), As Well As Delivery, Assembly And Integration Of New Water Attractions For Children Into The Pool Technology.3. The Modernization Involves Dismantling The Exit Pipe Located In The Swimming Pool Hall And Partially Outside The Building (Laminate Pipe Diameter 110 Cm, Length 5.60 M And 1.90 M) And Securing The Openings By Bricking Them Up, Completing The Facade, Making Internal Plasters, Laying The Pool Tiles And Installing A Glass Display Case With Dimensions Of 1.20 M X 2.20 M.4. The Next Element Is The Dismantling Of Reinforced Concrete Stairs With Stainless Steel Railings. The Stairs Have 20 Steps, Dimensions 1.40X0.30X0.17M And A Landing With Dimensions 1.80X1.44M. The Scope Also Includes Dismantling The 6M High Steel Staircase Located In The Slide Tower. The Stairs Are Placed On A Steel Pipe With 37 Steps, A Balustrade And A Landing Measuring 1.80 M X 1.40 M.5. The Next Stage Is To Build A Swimming Pool Paddling Pool By Building Two Walls, Insulating Them And Covering Them With Pool Ceramics. In One, On The Pool Side, A Linear Drain Made Of Stainless Steel Should Be Made. Then Completing The Pool Stoneware Tiles, Leveling The Floor And Lining A 1.5 Mm Thick Pool Foil In Light Blue, Protected With Two Layers Of Acrylic Coating.6. After Completing All The Work, Assembly And Installation Of The Purchased Water Attractions For Children Should Be Carried Out. Installation In Accordance With The Manufacturers Recommendations, If There Are None, In Consultation With The Supervisory Inspector.7. Scope Of Construction Works: 1) In Order To Perform The Above Task, In Particular: A) Demolition Of Reinforced Concrete Stairs: Protection Of The Floor With Slabs And Foil Against Destruction Of Stoneware Tiles, Dismantling Of The Double-Sided Stainless Steel Balustrade, Protection Of The Reinforced Concrete Structure - Stamping, Removal Of Ceramic Linings, Demolition Of Reinforced Concrete Structure Elements - Landing, Steps, Removal From The Building And Disposal Of Rubble Supplementing The Missing Swimming Pool Cladding After Demolishing The Stairs, B) Dismantling The Steel Staircase: Protecting The Floor With Slabs And Foil Against The Destruction Of Stoneware Tiles, Installing Scaffolding, Dismantling The Stair Steps And Balustrades Made Of Acid-Resistant Stainless Steel - Cutting With A Torch, Dismantling The Supporting Pipe Made Of Acid-Resistant Stainless Steel - Cutting With A Torch, Removing A Dismantled Steel S
Contact Information
Address
Ośrodek Sportu I Rekreacji Redzikowo Spółka Z Ograniczoną Odpowiedzialnością,Redzikowo,76-200,Pomorskie,Pl636 - Słupski
Contact No.
+48598412555
Email
prezes@osirredzikowo.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116793505
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.