Tenders are invited for Construction of the BeineuSaksaulsk Road Project in Kazakhstan (the "Project") Procurement of Works and Consultancy Services of Saksaulsk Road Project JSC KazAvtoZhol (the "Client"), a 100 per cent state-owned national road operator in Kazakhstan, has applied for a sovereign guaranteed loan from the European Bank for Reconstruction and Development ("the Bank" or "EBRD") to finance part of the construction of the BeineuSaksaulsk Road Project in Kazakhstan (the "Project"). The Highway forms part of the international EuropeCaucasusAsia (TRACECA) transport corridor and will facilitate overland trade between China and Western Europe via Kazakhstan. The highway has a total length of 799,653 kilometres (including: the length of the main road - 599.166 km and the length of access roads to settlements - 240.487 km) (Category II, single carriageway, design speed 120 km/h) and will be constructed across three regions: Mangystau, Aktobe and Kyzylorda. The total estimated investment cost of the Project is approximately KZT 780,259 million (equivalent). The overall BeineuSaksaulsk Road project is co-financed by the EBRD, the International Bank for Reconstruction and Development (IBRD/World Bank), Asian Development Bank, Development Bank of Kazakhstan and the Republic of Kazakhstan budget. The EBRD loan will finance the design, construction and maintenance of approximately 161.5 kilometres of the highway, located in Mangystau and Aktobe oblasts, comprising: (i) 160 km of main highway (km 0+000 to km 160+000), structured as four (4) separate lots under a Design-Build-Maintain (DBM) contract strategy; (ii) a 1.5 km access road to the village of Turysh; and (iii) one Intelligent Transportation System (ITS) facility at km 1+720. The components under the project are as follows: Component Description / Section Length Oblast Lot 1 Main highway: km 0+000 40+000 40.0 km Mangystau and Intermediate Control Arch (ITS) at km 1+720 Lot 2 Main highway: km 40+000 80+000 40.0 km + 1.5 km Mangystau and Access road to the village of Turysh Lot 3 Main highway: km 80+000 125+000 45.0 km Mangystau Lot 4 Main highway: km 125+000 160+000 35.0 km Aktobe Total 161.5 km In addition to the DBM Works contracts, the Project will require the procurement of the following consultancy services: Project Implementation Consultant (PIC) for construction supervision, contract management and employers representative functions during the design, build and maintenance phases of the DBM contracts. Estimated Total Project Value 211,783,064,067.00 Currency KZT Procurement Type Works,Consultancy Estimated Start Date of Procurement 03/08/2026. Tender Link : https://ecepp.ebrd.com/delta/noticeSearchResults.html
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116443881
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.