|
1. The Order Includes The Construction Of Poles, Suspension Of An Overhead Line Or Burying A Cable And Installation Of Lighting Fixtures In 6 Sections On The Above-Mentioned Roads: 1) Plot No. 4740, 4774, 4746/2, 4754, 4762/9, 4762/10, 4773/5, 4828/9 - Municipal Road No. 201728K In Wola Rzędzińska - Approx. 520 Meters Long, 8 Poles, 13 Fixtures (Some Of The Materials Will Be Provided By The Ordering Party), 2) Plot No. 141/6, 188/1, 186/1, 185 Ul. Mikołajczyka In Koszyce Wielkie, Length Approx. 155 Meters, 4 Poles, 4 Fixtures, 3) Plot No. 82/3, 71, 81/2, 294/4 In Nowodworz, Length Approx. 120 Meters, 3 Poles, 3 Fixtures, 4) Plot No. 616/3, 616/4, 617/2 In Łękawce, Length Approx. 250 Meters, 5 Poles, 6 Fixtures, 5) Plot No. 419 And Others In Koszyce Małe, Length Approx. 350 Meters, 8 Poles, 8 Fixtures. Note For Task No. 1, Plot No. 4740, 4774, 4746/2, 4754, 4762/9, 4762/10, 4773/5, 4828/9 - Municipal Road No. 201728K In Wola Rzędzińska - Approx. 520 M Long, 8 Poles, 13 Fixtures, - Employer Will Provide Materials In Stock, Purchased In December 2025, Worth Pln 21,509.39 Gross, According To The List Given In The Bill Of Quantities, Including: 1) Pole Pole E10.5/2.5 - 4 Pcs. Value Pln 5,412.002) Pole Pole E10.5/4.3 - 1 Piece Value Pln 1,582.693) Pole E10.5/6 Pole - 3 Pcs. Value Pln 5,904.004) Led Fixture - 8 Pcs. Value Pln 8,608.005) Asxs Rubber Cover 2X1.35 Value Pln 2.70Contractors Should Assume The Value Of Pln Zero In The Rms Statement For These Materials. The Detailed Scope Of Works Is Specified In The Design Documentation, Including The Site Development Design (Pz), Technical Design (Pt), Technical Specification For The Execution And Acceptance Of Works (Stwior) And Bills Of Quantities.
|