|
Snow-Clearing Services – Winter Road Maintenance For 3 Winter Seasons (2026/2027, 2027/2028, 2028/2029). Winter Road Maintenance For 3 Winter Seasons (2026/2027, 2027/2028, 2028/2029) 1. The Subject Of The Order Includes: Combating Slipperiness Of Road Surfaces Spreading Spreading Includes - Combating Slipperiness Of Road Surfaces According To Standard Iv, V And Vi Of Winter Road Maintenance Established By The Ordering Party In The Gostyń Poviat, Including The Following Communes: Gostyń, Piaski, Borek Wlkp., Krobia, Pępowo, Pogorzela And Poniec. A) Standard Iv - Road Surface Sprinkled With Salt, A Mixture Of Sand And Salt Or Brine To A Temperature Of -10 0C In Dangerous Places That Determine The Possibility Of Traffic, - In The Case Of Temperatures Lower Than -100C, The Road Surface Sprinkled With A Rough Mixture With The Addition Of At Least 30% Salt Or Sand, - Black Ice Is Allowed For Up To 8 Hours, - Ice Sheets Are Allowed For Up To 8 Hours; B) Standard V - Road Surface Sprinkled With A Rough Mixture With The Addition Of At Least 30% Salt Or Sand In Dangerous Places That Determine The Possibility Of Traffic. C) Standard Vi - Road Surface Sprinkled With A Rough Mixture With The Addition Of At Least 30% Salt Or Sand In Dangerous Places That Determine The Possibility Of Traffic. Detailed Rules For Spreading Are Set Out In Annex No. 9 To The Swz. 2. Snow Removal Includes: - Roads Classified As Standard Iv - With A Total Length Of 157,620 Km, In The Communes Of Gostyń, Piaski, Borek Wlkp., Krobia, Poniec, Pępowo And Pogorzela. – Roads Included In Standard V – 109.725 Km – Roads In The Krobia And Gostyń Communes And The District Road No. 4954P Gostyń-Smogorzewo In The Piaski Commune. – Roads Included In Standard Vi – 13,589 Km – Roads In The Gostyń And Krobia Communes. A) Standard Iv - The Road Is Cleared Of Snow Up To 8 Hours After The Rainfall Stops On The Entire Width Of The Road, - Covered Snow Is Allowed, - Snow Tongues Are Allowed, - Snowdrifts Are Allowed Up To 8 Hours After The Snowfall Stops, - Slush Is Allowed On The Road Up To 10 Hours, - Ice Sheets Are Allowed Up To 8 Hours, - The Road Is Cleared Of Snow On The Entire Width, B) Standard V - The Road Is Cleared Of Snow Up To 16 Hours After The Cessation Of Snowfall, In Places Of Snowdrifts, - Covered Snow Is Allowed, - Snowpack Is Allowed, - Snowdrifts Are Allowed Up To 24 Hours After The Cessation Of Snowfall, - Slush On The Road Is Allowed For Up To 10 Hours, - Ice Sheets Are Allowed For Up To 8 Hours, - At Least One Traffic Lane Cleared Of Snow With Passing Lanes, C) Standard Vi - Snow Is Allowed Loose, - Jammed Snow Is Allowed. Detailed Rules For Snow Removal Are Set Out In Annex No. 9 To The Swz.
|