|
1. The Subject Of The Order Is The Implementation Of The Investment Task Titled: Thermal Modernization Of Kindergarten No. 18 At Ul. Rolnika 33 In Zabrze, Consisting In The Performance Of Thermal Modernization And Renovation Works, Which Includes: Architectural And Construction Industry: • Dismantling Of Siding And Metal Sheets On The Facade, • Insulation Of All External Walls Of The Kindergarten Building Along With The Colors Of The Facade, • Insulation Of The Walls Of The Ground Floor, Basement And Foundation Walls • Dismantling Of The Wall Adjacent To The Building And Supplementing The Fence, • Insulating The Ceilings Above The Top Floor And Insulating The Flat Roof, • Damp-Proof Insulation Of The Basement Walls, • Partial Repair And Replacement Of The Roof Covering, Replacement Of Sheet Metal Flashings, • Checking The Patency Of External Sewage Systems With Replacement Of Drain Cleaners, • Removal Of The Existing Roof Over The Door And Installation Of New Ones, • Replacement Of Rainwater Sewage Risers With Possible Routing Of Downspouts Along The External Walls Building, • Replacement Of The Ladder Leading To The Roof Of The Building, • Renovation Of External Stairs, • Construction Of An External Ramp, • Replacement Of Window Joinery Together With External And Internal Sills, • Renovation Of Fanlights Of Basement Windows, Including Replacement Of Basement Windows And Dismantling Of Window Walls, • Disassembly Of Steel Grates In Windows And Securing Them With Anti-Burglary Foil, • Replacement Of External Doors, • Partial Replacement Of Internal Joinery, • Repair Of Floors In Places Where Replacement Of Installation Levels,• Painting All Walls And Ceilings Of The Kindergarten, Taking Into Account Necessary Repairs And Supplementing The Surfaces Of Walls And Ceilings, Supplementing Tiles In Pierced Places, (The Color Should Be Agreed With The Facility Management),• Replacement Of The Existing Wooden Balustrade In The Staircase With A New One Made Of Stainless Steel,• Replacement Of Terracotta On The Floor In The Cloakroom,• Construction Of A Suspended Ceiling In The Cloakroom Room,• Replacement Of The Existing Partition Wall Of A Light Wooden Structure At The First Floor Level,Sanitary Industry:• Replacement Central Heating Installation With Risers, Radiators And Thermostatic Valves, • Replacement Of The Central Utility Water Installation, • Renovation Of A Dual-Function Heating Unit. Electrical Industry: • Replacement Of The Electrical Installation With Electrical Equipment And Lighting Installations With Energy-Saving Ones, Excluding The Kitchen, Which Was Renovated As Part Of Another Investment, • Replacement Of Old Electrical Switchboards, • Replacement Of The Lightning Protection Installation, 2. A Detailed Description Of The Subject Of The Contract Is Included In Part Iii Of The Swz.
|