Quotation Are Invited For Installation Of Closed Cooling Water Supply And Return Line Valve In Each Hrsg At L-2 Station 1032603464 1 Item-00001 Technical And General Specification Of Outsourcing Work At L-2 Station,Jebel Ali Power Stationtitle: Installtion Of Closed Cooling Water Supply And Return Line Valvein Each Hrsgsize And Quantity:Size#Valve #No Of Joint #Material#6"#Gate Valve #16# A 216-Wcb#Note : Invoice Lumpsum Basismaterial :Work Schedule: Duration - 2 Dayspre-Bid Site Inspection: The Contractor Shall Visit The Site And Befully Familiar With The Work Scope, Plant Access, Facilities,Complexities, Etc., Before Submitting The Bid. Dewa Wil L Not Accept Anyclaim For Extras Beyond The Order Rates / Prices During And After Theexecution Of Work.Scope Of Work:Mobilize Men/Eq Uipment Within 01 Days Of Advance Notice.Submit Following Documents To Obtain Ptw,Method Statementrisk Assessment Of The Worktoolbox 1 Ae Talk Report.Obtain Ptw (Permit To Work) And Lc (Line Clearance) From Dewa.Conduct Site Survey And Safety Inspection, To Assess The Workingenvironment.Ensure Site Area Is Correctly Secured And Safe To Work On In Allrespects.Ensure Proper Isolation Of The Line & De Wa Chemist Clearance & Hwp Areobtained Daily Before Start Of Work.Ensure No Flammable Materials Near The Hot Work Area.If The Workin G Environment Is Safe, Proceed With The Following Steps.For Hot Work, Welding Booth To Be Provided To Prevent Welding Spark Orcuttin G Materials Coming Out From Hot Work Area. Ensure To Provideenough Fire Extinguisher, Fire Blankets At Site.Protect The Nearby Lines / Cables Using Fire Blanket.Barricade The Area Below With Signageproceed With Cutting/Removal Of Pipe & Prepare The Joints.Weld The Pipe Fittings.Qualified Job Supervisor Shall Be Assigned For The Job.Skilled Fabricators / Welders Shall Carry Out All The Jobs.Wel D Joints To Be Made By Qualified Welder According To Applicable Wps &Asme Requirements. (Wps & Welder Certificates To Be Provided)Ho Usekeeping And Disposal Of Waste To Be Done Before Site Clearance.De-Mobilize Men And Equipment After Completion Of The Job.Work Com Pletion Report To Be Submitted. Report Shall Contain Relevantphotos.All Tools & Tackles Are In Contractors Scope.Proper And Tested Tools To Be Used.All Lifting & Power Tools Shall Have Valid 3Rd Party Test Certificate.Welding Machine Shall Have 3Rd Party Calibrat Ion Certificate. Special Notes / Instructions: Installtion Of Closed Cooling Water Supply And Return Line Valve In Each Hrsg At L-2 Station Contact - S.Arun Kumar / 0568048912 / Arunkumar.Sethuraman@Dewa.Gov.Ae Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332601834)/$Value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116236682
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.