Plasterboard Works – Bf. Berlin Zoological Garden - Ve 311: Drywall Work Ba 3. Suspended Ceiling Slats: 30 M² Ceiling Covering. Felt Slat W 40Mm H 105Mm L 1000-4000Mm Uk Aluminum Support Profile 10 M² Allowance For Ceiling Covering. Felt Slats On Vaulted Ceiling With Dowel System 11 M Edge Connection End Caps 12 Pieces Create Opening 4 Pieces Inspection Flap Soundproof Ceiling: 153 M² Multi-Layer Board Wood Wool Rock Wool 153 M² System Ceiling Self-Supporting, Walkable, F 90-Ab 111 M Fire Protection Carrier 146 M² Sub-Ceiling Plaster Perforated Plate. Single Layer 65 M Uk Reinforce Cd Profile 13 Pieces Edge Connection System Ceiling F90-Ab On Wall 49 M Edge Connection Multi-Layer Panel. On Masonry And Concrete 82 M Edge Connection System Ceiling F90-Ab 130 M Edge Connection Under Ceiling. Plasterboard 4 Pieces Create Opening W 1 M L 1.1 M F90-Ab System Ceiling, Self-Supporting, Walkable 4 Pieces Create Opening B 0.9 M L 1.1 M Ceiling Plate. Plaster Perforated Plate 13.3 M² Metal Ceiling F90-Ab Cantilever Removable 36 M Edge Connection Metal Ceiling F90-Ab Support Suspended Ceilings: 6 M² Suspended Ceiling Plasterboard. Single-Layer Construction Plan. 5 M² Suspended Ceiling Cement Construction Plan. Single Layer 22 M Connection Ud Profile 9 Pieces Create Opening 3 Pieces Inspection Flap Snap Lock Partition Walls: 118 M² Partition Wall H Up To 4 M Facing Shells: 102 M² Facing Shell Pre-Wall Installation 57 M² Facing Shell Connections: 39 M Connection Partition Wall To Solid Component Sliding 30 M Connection Facing Shell Pre-Wall Installation To Solid Component Sliding 16 M Connection Facing Shell Free-Standing Sliding Solid Component Openings: 6 Pcs. Create Door Opening 128 Pcs. Create Opening Clothing Steel Frame Construction Guard Counter: 8 M² Clothing Steel Frame Construction Guard Counter 7 M Create Opening W 5Cm Clothing Steel Frame Construction On The Underside Sliding Door System: 1 Pc Sliding Door System 1-Leaf Inspection Flaps: 12 Pcs Inspection Flap Frame Aluminum Room-In-Room System: 23 M² Partition Room-In-Room System 9 M² Ceiling Room-In-Room System Uk Steel Sheet Profile, Limited Access Partitions On Room-In-Room System: 14 M² Partition On Room-In-Room System Partitions On Room-In-Room System: 26 M² Partition On Room-In-Room System Connections: 4 M Connection Ceiling Construction To Solid Component Steel Angle 10 M Connection Partition To Room-In-Room System Sliding To Solid Component Openings: 3 Pcs Create Door Opening 40 Pieces Create Opening Sanitary Partitions: 1 Piece Partition System Showers Hpl Composite. 1 Piece Partition Wall System Toilet Hpl Composite 1 Piece Urinal Partition Hpl Composite. Sliding Door System: 1 Piece Sliding Door System 1-Leaf W 860Mm H 2110Mm In Partition Room-In-Room System Fire Protection Clothing Ventilation Duct (Bma Room): 1.6 M Ltg-Bekl. Rectangular Bma Duct F90 Fire Protection Clothing Carrier: 22 M Fire Protection Cladding. Rectangular Support R90 10 Pieces Edge Connection Fire Protection Coating. Carrier R90 14 Pieces Create Opening 11 Pieces Inspection Flap Cement. Inspection Door - Sealing: 2 Pieces Of Inspection Door, 1 Wing With Frame, 1 Piece Of Sealing, Inspection Opening, Fire Protection Cladding, Steel Frame Constructions: 17 M Fire Protection. Rectangular Support R90 3-Sided 18 Pieces Connection Fire Protection Cover R90 Tr
Contact Information
Address
Europaplatz 1
Contact No.
+49 20330174721
Email
kai.brinkmann@deutschebahn.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116198664
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.