|
Building Construction Work - Construction Of The Municipal Data Processing Center, Administrative, Office And Warehouse And Workshop Buildings, Including Soc And Noc, Along With Land Development And Reconstruction Of Existing Infrastructure - Stage 1 - 2 Of The Procedure. The Subject Of The Order Is The Construction Of A Municipal Data Processing Center, Administrative And Office Buildings, As Well As Warehouse And Workshop Buildings, Including Soc And Noc, Together With Land Development And Reconstruction Of The Existing Infrastructure - Stage 1, Along With Accompanying Works And Activities Necessary To Carry Out The Construction Works Described In The Designed Post1) The Subject Of The Order Is The Construction Of A Municipal Data Processing Center, Administrative And Office Buildings, And Warehouse And Workshop Buildings, Including Soc And Noc, Together With Land Development And Reconstruction Of Existing Infrastructure - Stage 1, Together With Accompanying Works And Activities Necessary To Carry Out Construction Works Described In The Draft Provisions Of The Contract, As Well As Obtaining A Decision On The Occupancy Permit And Submitting Complete As-Built Documentation. 2) The Data Processing Center Facility Constructed As Part Of Stage 1 Is To Meet The Requirements Necessary To Obtain The En 50600 Certificate - Safety Class 3, Availability Class 3 And Level 3 Energy Efficiency Monitoring. The Certification Procedure Will Be Carried Out By An Accredited Data Center Certification Body Selected By The Ordering Party, And The Contractor Is Obliged To Provide All Activities, Documentation, Tests And Information Necessary To Effectively Obtain The Above-Mentioned. Certificate. 3) A Detailed Description Of The Subject Of The Contract Is Included In This Swz And In: Description Of The Subject Of The Order - Annex No. 1 To The Swz (Confidential Part), Design Documentation - Annex No. 2 To The Swz (Confidential Part), Multi-Sector Technical Specification For The Execution And Acceptance Of Construction Works (Hereinafter Referred To As Stwiorb) - Annex No. 2 To The Swz (Confidential Part), Decision No. Ab-83/2026 Of February 17, 2026, Approving The Land Development Design And The Architectural And Construction Design And Granting A Construction Permit - Annex No. 3 To The Swz, Draft Provisions Of The Contract - Annex No. 4 To The Swz. 2) The Data Processing Center Facility Constructed Under Stage 1 Is To Meet The Requirements Necessary To Obtain The En 50600 Certificate - Safety Class 3, Availability Class 3 And Level 3 Energy Efficiency Monitoring. The Certification Procedure Will Be Carried Out By An Accredited Data Center Certification Body Selected By The Ordering Party, And The Contractor Is Obliged To Provide All Activities, Documentation, Tests And Information Necessary To Effectively Obtain The Above-Mentioned. Certificate. 3) A Detailed Description Of The Subject Of The Order Is Included In This Swz And In: Description Of The Subject Of The Order - Annex No. 1 To The Swz (Confidential Part), Design Documentation - Annex No. 2 To The Swz (Confidential Part), Multi-Sector Technical Specification For The Execution And Acceptance Of Construction Works (Hereinafter Referred To As Stwiorb) - Annex No. 2 To The Swz (Confidential Part), Errat No. 1 And Erracie No. 2 To The Design Documentation - Annex No. 2 To The Swz (Confidential Part), Decision No. A
|