Structural Shell Work – Rohbauarbeiten. 23,600 M³ Soil And Foundation Excavation 748 T Prov. Steel Structure, Passable 32,000 M³ Backfilling Work Rooms 5,180 M³ In-Situ Concrete Fillings 3,900 M² Formwork Point And Strip Foundations 5,480 M³ In-Situ Concrete Floor Slab Wu 6,680 M³ In-Situ Concrete Outer Walls 3,220 M³ In-Situ Concrete Interior Walls 12,150 M² Formwork Staircase Walls, Elevator Shafts 1180 M³ In-Situ Concrete Interior Supports 260 M³ In-Situ Concrete Outer Supports 870 M³ In-Situ Concrete Beams 28,250 M³ In-Situ Concrete Ceilings, Platforms 185 M³ In-Situ Concrete Chimney Structure 65 M² Machine Foundations 35 T Of Reinforcing Bars, Mats 16 Pieces Of Steel Composite Beams 83 Pieces Of Prefabricated Slab Stairs 660 M² Hollow Body Wall 776 M² Semi-Finished Light Wells 19,900 M² Ks Masonry F0 To F90 A+M 5,500 M² Sealing Pmbc 5,900 M² Sealing Bitumen Welding Membrane 7,800 M² Temporary Sealing 1,700 M² Fresh Concrete Composite Sealing 2,500 M² Perimeter Insulation 13,000 M² Base Filter Layer, Drainage Under The Floor Slab, Foundation Penetrations 2,300 M Temporary Drainage 140 Pieces Cleaning Closures And Floor Drains 6,350 M Underground Pipes 50 Pieces Inspection Shafts 4 Pieces Lifting Systems 1 Piece Cistern 90 M³ 1 Piece Ice Energy Storage, 1197M³, Ø17.5M 1 Piece Ice Energy Storage, 796M³, Ø13m 43,500 M Ring/Foundation Earth, Conductors, Potential Equalization Conductor 8,500 M Flexible Kupa 1,900 M Plastic Spiral Hose (Empty Pipe) 6 Pieces Cable Pull Shafts 2,000 Pieces Built-In Parts Inlay Work
|