Overview Of The Projectthe Track Package Includes Scope A Which Is The Main Line Track From Ramsay Inglewood Station In The North To The End Of The Project Limits, As Well As Scope B The Maintenance Storage Facility (Msf) Track. Scope C Includes Both Scopes.For Scope Delineation, This Rfp Is Divided As Follows:• Scope A: Main Line Track• Scope B: Maintenance & Storage Facility (“Msf”) Track• Scope C: Combined Track Package (Scopes A And B) In Its Entirety.Scope A Main Line Trackballasted Track: From The Top Of Rail (Tor) To The Top Of The Sub-Ballast.• Test Track Works• Special Trackwork (E.G., Turnouts, Crossovers)• Track-Related Row Equipment, Crossings, And Appurtenances• Ducting, Cable Containment, And Associated Infrastructure• Boundary Limit South Of The Msf Turnaround (See Scope B Figure Below)• Design And Implementation Of All Temporary Works.• Field Review, Monitoring, And Reporting For Temporary Works.• Support Of Excavation.• Laydown Areas And Traffic Management.• Construction Noise And Vibration Mitigation.• Environmental Mitigation Protection Measures.• Provide All:O Labour, Supervision, And Managemento Materials, Plant And Equipmento Survey, Quality Control, And Environmental Controlo Documentation And Testing Supporto Interface Coordinationscope B Msf Trackmsf Trackwork Supply And Installation Including:O Direct Fixation (Df) Track: From The Top Of Rail (Tor) To The Bottom Of The Plinths (Second-Pour Concrete).O Ballasted Track: From The Top Of Rail (Tor) To The Top Of The Sub-Ballast.• Msf Trackwork (Yard And Shop) Supply And Installation• Test Track Works• Special Trackwork (E.G., Turnouts, Crossovers)• Track-Related Row Equipment, Crossings, And Appurtenances• Ducting, Cable Containment, And Associated Infrastructure• Boundary Limit North Of The Msf Turnaround (See Scope B Figure Above)• Design And Implementation Of All Temporary Works.• Field Review, Monitoring, And Reporting For Temporary Works.• Support Of Excavation.• Laydown Areas And Traffic Management.• Construction Noise And Vibration Mitigation.• Environmental Mitigation Protection Measures.• Provide All:O Labour, Supervision, And Managementmaterials, Plant And Equipmento Survey, Quality Control, And Environmental Controlo Documentation And Testing Supporto Interface Coordinationscope C Combined Track Package (Scopes A And B)• Main Line Trackwork Supply And Installation Including:O Direct Fixation (Df) Track: From The Top Of Rail (Tor) To The Bottom Of The Plinths (Second-Pour Concrete).O Ballasted Track: From The Top Of Rail (Tor) To The Top Of The Sub-Ballast.• Msf Trackwork Supply And Installation Including:O Direct Fixation (Df) Track: From The Top Of Rail (Tor) To The Bottom Of The Plinths (Second-Pour Concrete).O Ballasted Track: From The Top Of Rail (Tor) To The Top Of The Sub-Ballast.• Msf Trackwork (Yard And Shop) Supply And Installation• Test Track Works• Special Trackwork (E.G., Turnouts, Crossovers)• Track-Related Row Equipment, Crossings, And Appurtenances• Ducting, Cable Containment, And Associated Infrastructure• Design And Implementation Of All Temporary Works.• Field Review, Monitoring, And Reporting For Temporary Works.• Support Of Excavation.• Laydown Areas And Traffic Management.• Construction Noise And Vibration Mitigation.• Environmental Mitigation Protection Measures.• Provide All:O Labour, Supervision, And Managemento Materials, Plant And Equipmento Survey, Quality Control, And Environmental Controlo Documentation And Testing Supporto Interface Coordinationthe Following Provisions And Items Are Applicable To All Respective Trackwork Scopes, Comprising But Not Limited To The Following:General Provisions• Deliver A Complete, Coordinated, Safe, Maintainable, And Commissionable Lrt Track System For The Respective Trackwork Scope.• The Scope Split Matrix Provided In Schedule 9 Construction Contract Form, With The Proponent Taking Primary Responsibility For Trackwork.• Applies Across Design, Procurement, Construction, Testing, Commissioning, Handover, And Warranty.Track Equipment, Including The Supply, Fabrication, Delivery, Installation, Adjustment, Inspection, And Acceptance Of:• Running Rail• Jordan Rail• Ties• Ballast• Direct Fixation Assemblies• Embedded Track Components• All Required Fittings And Fixations• Guard Rails• Restraining Rails• Insulated Joints• Expansion Joints• Rail Anchors• Rail Lubricators• End-Of-Track Protection Devices• Special Trackwork• Switch Clearance Devices• Switch Heater Equipment• Level Crossings• Track Drainage Interfaces• Cable Containment• Track Troughs• Concrete Plinths (Second Pour)System Assurance For The Scope Of Trackwork, Including All Applicable Inspection, Testing, And Commissioning Activities Required For The Respective Trackwork Scopes, Including:• Factory Acceptance Testing (Fat)• Factory Integration Testing (Fit)• Pre-Installation Check-Out (Pico)• Site Acceptance Testing (Sat)Integrated Interface Testing• Trial Running Support• Closeout Evidence• Acceptance Testing• Any Other Activities Applicable To The Specific Scope Of Work.Interfaces With Other Construction Packages• Stations, Bridges, Msf Building• Public Roads And Pedestrian Crossings• Utility Zones And Embedded Track Areas• Transition Slabs And Systems Equipment Locations• Temporary Tie-Ins For Staged Construction• Communications & Traction Power Systems (Wayside)• Signaling & Train Control Systems
|