|
1. Name Of The Order: Renovation Of The Cloakroom And Sanitary Facilities At The Henryk Sienkiewicz Primary School In Rutka-Tartak.2. Determination Of The Subject Of The Order: The Subject Of The Order Is A Comprehensive Renovation Together With The Delivery, Manufacture, Assembly And Commissioning Of Complete Equipment For The Locker Room And Sanitary Facilities At The Gym, Including In Particular Locker Room Rooms, Hygiene And Sanitary Rooms, Toilet Units, Shower Units As Well As Sanitary Rooms Intended For People With Disabilities.3. Renovation Of The Cloakroom And Sanitary Facilities At The Primary School. Henryk Sienkiewicz In Rutka-Tartak At Ul. Szkolna 12 In Rutka-Tartak, Includes The Following Rooms: 1) Communication Corridor (Room 28), 2) Toilet (Room 40), 3) Toilet For Disabled People (Room 39), 4) Social Room (Room 38), 5) Mens Cloakroom (Room 37), 6) Womens Cloakroom (Room 36), 7) Storage Room (Room 41), 8) Storage Room - A Room Created After The Reconstruction Of The Hygiene And Sanitary Rooms Of The Cloakroom (Room 42).4. The Scope Of The Order Includes The Performance Of All Works And Supplies Necessary To Obtain A Complete, Technically Efficient And Ready-For-Use Cloakroom And Sanitary Facility, Including In Particular: 1) Demolition Of Walls Designated For Removal, 2) Dismantling Of Existing Ceramic Wall And Floor Coverings, 3) Dismantling Of Doors And Door Frames, 4) Dismantling Of Existing Suspended Ceiling Coverings Made Of Plasterboards, 5) Dismantling Of Existing Ceramic Wall Cladding, 6) Dismantling Of Existing Ceramic Floor Cladding, 7) Dismantling Of Sanitary Fittings, 8) Construction Of New Partition Walls From Silicate Blocks With Thin-Layer Mortar, 9) Construction Of New Door Openings In The Walls With Installation Of Lintels, 10) Replacement Of Internal Doors And Door Frames, 11) Execution Of Cement And Lime Plasters On The Newly Constructed Walls Partitions And Door Jambs, 12) Replacing Floor Drains In Sanitary Rooms And Installing Linear Drains In Showers, 13) Leveling Existing Walls And Floors Or Restoring The Required Layers Of Walls And Floors, 14) Making New Plasterboard Ceiling Claddings, 15) Making Damp-Proof Insulation To The Required Extent, 16) Making New Gypsum Finishes, 17) Making Claddings New Wall And Floor Coverings,18) Painting Walls (Above The Wainscoting), 19) Painting Ceilings, 20) Carrying Out Water Supply And Sewage Installation Works, I.E. All Necessary Approaches And Connections, 21) Carrying Out Tests, Adjustments And Inspections,22) Carrying Out Electrical Installations To The Extent Necessary To Complete The Order,23) Carrying Out Lighting And Power Supply For Devices, In Accordance With The Documentation,24) Delivery And Installation Of Sanitary Toilet Cabins,25) Delivery And Assembly Of Integrated Cabins Including Toilet Stations And Shower Cabins, 26) Delivery And Installation Of Sanitary Equipment, 27) Delivery And Installation Of Sanitary Fittings, 28) Delivery And Installation Of Hygie
|