|
Construction Work - Expansion Of The Waiwiz Building With The Building Of The Sustainable Development Technology Center And The Center Of New Technologies And Innovations Of The Poznań University Of Technology (Czrnti Pp), Including A Protective Structure. The Subject Of The Order Is The Implementation Of The Task Entitled Expansion Of The Waiwiz Building With The Building Of The Sustainable Development Technology Center And The Center Of New Technologies And Innovations Of The Poznań University Of Technology (Czrnti Pp), Including A Protective Structure In The Design And Build Formula, Along With: Roads, Fire Road, Parking Lots, Sidewalks, Terrain, Greenery, Technical Infrastructure With Its Spacers And The Liquidation Of Inactive Installations In The Area Warta Campus Of The Poznań University Of Technology In Poznań At Ul. Jacek Rychlewskiego 2 On Registered Plots Owned By The Poznań University Of Technology. Existing Building - Wawiz - Use Without Changes As A Higher Education Building. Extension - Czrnti Pp Science And Education Building, Laboratory And Research Building Classified As A Protective Building With Two Shelters And Two Hiding Places On Level -1. In The Designed Czrnti Pp Building, In The Underground Part/On Level 0, A Complementary Function Is Planned - A Shelter And Concealment Function - In The Form Of A Designed Protective Structure Divided Into Two Independent Parts: - The First - A Two-Zone Concealment In The U3 Protective Structure Resistance Category - The Second - A Two-Zone Shelter In The S1 Protective Resistance Category. The Rooms On The Underground Floor/Level -1 Will Have A Supplementary Function In The Event Of A State Of Emergency Or In Times Of War. In The Remaining Time, They Will Perform The Basic Function Provided For In The Design Of The Ctzrnti Pp Building. The Subject Of The Order Includes The Design And Implementation Of The Investment In Compliance With The Dnsh Principle For All Six Environmental Objectives Specified In Art. 9 And 17 Of Regulation (Eu) 2020/852 Of The European Parliament And Of The Council Of 18 June 2020 On Establishing A Framework To Facilitate Sustainable Investment, Amending Regulation (Eu) 2019/2088. The Planned Task Under The Design And Build Formula Includes: • Preparation Of Multi-Discipline Design Documentation, Including Technical Designs (Pt), Executive And Workshop Designs (Pw), As-Built Documentation (Dp) And The Necessary Research, Expert Opinions And Reports, Including In The Field Of Acoustics, Radiation, Etc., • Implementation Of Investments In The Field Of: Land Development Elements, The Complete Czrnti Pp Building, An Underground Connector Between The Faculty Of Architecture And The Faculty Of Management Engineering (Waiwiz) And Czrnti Pp, Supporting Structure For Photovoltaic Panels Above The Courtyard Of Czrnti Pp, Generator Chambers, Pedestrian Route At The Ceiling Level Above Floor -1 With External Stairs, Located On The Eastern Side Of Czrnti Pp, Which Is Also The Housing Of The Ventilation System Of The Protective Building, Reconstruction Of The Off-Road Pedestrian Route - Access From The Eastern Side Of Waiwiz In In The Scope Of Changing The Shape, Relocation Of Existing And Construction Of New External Stairs, • Submitting Administrative Notifications Along With Obtaining The Necessary Arrangements, Consents And Permits
|