|
1. The Subject Of The Order Is The Performance Of Construction Works Related To The Construction Of Covered Outdoor Stages In The Łącko Commune, On The Terms Specified In The Swz. The Order Is Divided Into Two Parts, I.E.: • Part No. 1 - Construction Of An Outdoor Stage In Jazowsko - Consisting Of The Construction Of A Covered Outdoor Stage With A Social And Sanitary Building With Internal Installations (Water And Sewage, Central Heating And Electricity) And External Construction Devices In The Form Of: A Dug Well, A Septic Tank For Liquid Waste And The Following Installations: Rainwater With An Outlet To The Ditch, Electricity Including Lighting, And Parking Stations, Places For Collecting Solid Waste, Access Roads, Access Roads And Hardening Of The Area, On Plot No. 593/1 Located In The Registration Area Of Jazowsko, Commune. Łącko, Which Includes The Following Types Of Works: 1) In The General Construction Industry: A) Construction Of A Social Building: - Earthworks - Building Structure (Foundation Strips, Slab On The Ground; Insulation; Masonry Structure Of The Ground Floor, Reinforced Concrete Ring Beams, Lintels, Slab; Roof - Roof Structure And Covering, Attic Walls, Insulation; Finishing Of Floors And Walls) - Window And Door Joinery And Joinery - Elevationb) Construction Of A Stage Facility: - Earthworks - Building Structure (Foundation Strips, Slab On The Ground; Insulation; Ground Floor Structure; Roof - Roof Structure And Covering, Attic Walls, Insulation; Floor And Wall Finishing) - Joinery C) Land Development: - Accesses And Architraves2) In The Sanitary Industry: A) External Installations (Water Supply, Sanitary Sewage System, Rainwater Drainage): - Preparation Of The Site For Construction, Works Earth - Sanitary Sewage System, Septic Tank, Rainwater Sewage System - Water Supply, Well - Post-Construction Inventory And Landscaping B) Internal Installations (Cold Water - Hot Water, Hot Water - Hot Water, Sanitary Sewage): - Water Supply Installation - Sanitary Sewage Installation - Heating Installation3) In The Scope Of The Electrical Industry: A) Construction Of Electrical Installation: - Power Supply For Rz And Rs Switchboards - Rs And Rz Switchboards - Installation Of Sockets, Outlets 1-Phase 3-Phase - Basic Lighting Installation - Call Installation - Lightning Protection And Earthing Installation - Installation Of Local Equalizing Busbars2. During The Works, Access And Access To Existing Facilities Should Be Ensured, Limiting The Nuisance Caused By Construction Works To A Minimum. Demolition Materials Should Be Classified As Rubble Or Reusable Material. The Rubble Will Be Transported By The Contractor From The Construction Site To The Disposal Site, And The Reusable Materials Will Be Transported By The Contractor From The Construction Site To The Place Indicated By The Ordering Party.3. A Detailed Description Of The Subject Of The Order Regarding Part No. 1 Is Included In The Design Documentation Constituting Annex No. 4 To The Sw
|