The Subject And Scope Of The Contracts Construction Works Include Hardening The Road With Yomb Concrete Slabs With Dimensions Of 100X75cm And A Length Of Min. 692 M With Min. Width 3.0 M In The Town Of Popowo. The Surface Should Be Laid In Such A Way That The Slabs Interlock (Shift The Slabs Between Each Other In Half Of Their Length). The Boards Should Be Placed On A Prepared Layer Of Gravel With A Thickness Of 10Cm According To The Attached Drawing. The Concrete In The Bill Of Quantities Was Laid On A Larger Area Due To Filling The Holes In The Slabs. The Transverse Slope Of The Road Should Be Maintained At 2% On One Side, Or A Roof Slope Is Allowed In Some Places. (The Way The Slabs Are Arranged Makes It Possible To Divide Slopes Along The Road Axis). On The Sides Of The Surface, Reinforce The Slabs With A Width Of Min. 0.5 M From Material Previously Obtained From Preparing The Trough For The Slabs. The Mix Should Have A Min/Max Grain Size Of 0/16. Alternatively, Sieved Sand With A Grain Size Of Min/Max 0/4 Can Be Used; The Use Of Washed Sand Is Excluded. The Contractor Is Obliged To: 1. In The Event Of Damage To Existing Underground Utilities, Cables, Wires, Ducts, Etc., The Contractor Is Obliged To Repair The Damage And Bear All Related Costs.2. In The Event Of Damage To The Boundary Stones, The Contractor Will Be Obliged To Replace Them At His Own Expense.3. Restoration Of The Work Site And Infrastructure To Its Original Condition.4. Tidying Up The Construction Site.5. The Contractor Is Obliged To Notify All Necessary Institutions And Network Managers About The Commencement Of Construction Works At Least 7 Days In Advance, Obtaining Appropriate Declarations After The Completion Of The Works, And Familiarize Himself With The Content Of The Arrangements Contained In The Design Documentation.6. Before Entering Areas Owned By Natural Persons, The Contractor Is Obliged To Notify Them Of The Date Of Commencement Of Works At Least 7 Days In Advance. After Completing The Works On Private Plots, The Contractor Is Obliged To Obtain A Written Statement From The Owner That He Has No Comments On The Works Performed And That The Area Has Been Tidied Up.7. Conduct Work In A Way That Allows Entry To The Property.8. Preparation Of An As-Built Cost Estimate After Completion Of Construction Works. A Detailed Description Of The Subject Of The Order Is Included In The Attachments: 1. Design Documentation. 2. Bill Of Quantities.3. Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb). In Case Of Interpretation Doubts As To The Scope Of Works, The Following Order Of The Above-Mentioned Documents Will Apply: 1. Design Documentation2. Stwiorb3. Bill Of Quantitiesinformation Regarding Carrying Out A Site Visit. The Ordering Party Does Not Require A Site Visit Or Reading The Design Documentation At The Ordering Partys Premises. Other Information1. A Contractor Who Refers To A Solution Equivalent To That Described By The Ordering Par
Contact Information
Address
Gmina Cewice,Cewice,84-312,Pomorskie,Pl636 - Słupski
Email
sekretariat@cewice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116097127
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.