|
1. The Subject Of The Order Is The Demolition Of Seven Unused Buildings In Kalisz At Ul. Fabryczna 4-8 (Precinct 035 Śródmieście Ii, Plot No. 38, 39, 41/2, 41/4, 41/5,41/6).2. The Scope Of Work Includes: 1) Determining The Scope Of Necessary Works: Demolition Works Of Buildings Located On Plots No. 38, 39, 41/2, 41/4, 41/5, 41/6, Together With The Performance Of Works Securing Neighboring Buildings, And Works Related To The Need To Build A Fence On The Border Of The Plots, Development Of The Area After Demolitions, Reconstruction Of The Remaining Walls Of Adjacent Buildings, The Remaining Parts Of The Facility And Others, Along With The Preparation Of Technical Documentation - Demolition Design, 2) Identification Of The Demolition Conditions, In Particular: Identification Of The Infrastructure In Terms Of The Conditions For Disconnecting Or Relocating The Devices Supplying The Facility With Utilities And Then Applying To The Utility Owners To Disconnect And Deactivate All Existing Installations, Identification Of The Availability Of The Area (Crossings) For Demolition Purposes And Other Restrictions, 3) If Necessary, Obtaining, At The Expense Of The Contractor, Documents Necessary To Complete The Order, E.G. Buildings, 4) Obtaining The Necessary Arrangements And Decisions On Behalf Of The Ordering Party At The Contractors Expense, Including: Decision Of The Conservator Of Monuments.5) Obtaining A Demolition Permit On Behalf Of The Ordering Party At The Expense Of The Contractor.6) Preparation Of A Construction Cost Estimate (1 Copy + Electronic Version In *.Pdf File Format And *.Ath Format Enabling Reading In The Norma Cost Estimate Program) Based On The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On Determining The Methods And Basis For Preparing An Investors Cost Estimate, Calculating Planned Costs Of Design Works And Planned Costs Of Construction Works Specified In The Functional And Utility Program (Journal Of Laws Of 2021, Item 2458).7) Preparation Of Information On Safety And Health Protection (Bioz) 2 Copies In Written Form + Electronic Version In *.Pdf, *.Doc File Format.8) Demolition Of The Building In Accordance With The Approved Design And Obtained Permit,9) Removal Of Demolition Materials And Their Disposal In Accordance With With Applicable Regulations,10) Tidying Up The Area After Completion Of The Works And Securing (Fencing) The Area After Demolition.3. A Detailed Description Of The Subject Of The Order Is Included In The Swz And Annexes To The Swz.
|