4.1. The Subject Of The Order Is The Implementation Of Construction Works For The Investment Project Entitled: Thermal Modernization Of The Building Of The School Complex In Łomazy. 4.2. The Order Includes: A) Construction And Installation Of A Photovoltaic Installation On The Roof Of The Building Of The School Complex In Łomazy, Including: • Installation Of Information And Warning Signs, • Installation Of Photovoltaic Panels On The Structure Intended For The Designated Installation Site, • Installation Of Inverters And Other Devices, • Installation Of Complete Cabling, • Installation Of Surge Protection, • Running Ac Cables To The Location Of The Existing Building Fuse Board And Adapting It To Connect A New Circuit, Photovoltaic System Will Be Connected To The Buildings Internal Electrical Installation And To The Power Grid, In Accordance With The Design Documentation And Conditions Of The Relevant Distribution System Operator. The Electricity Generated By The Installation Will Be Used Primarily For The Facilitys Own Needs. Any Surplus Energy Will Be Fed Into The Power Grid And Settled In Accordance With The Regulations In Force On The Date Of Connection Of The Installation And The Terms Of The Concluded Contracts. The Contractor Will Perform All Technical And Documentation Activities Required For Proper Notification, Connection, Commissioning And Operation Of The Installation, Within The Scope Specified In The Order Documents. B) Construction And Installation Of An Energy Storage Facility. The Investment Includes The Installation Of An Energy Storage Facility, The Purpose Of Which Will Be To Store The Surplus Of Electricity Produced From The Pv Installation In Relation To The Facilitys Current Demand For Electricity. Electricity From The Storage Will Optimize Auto-Energy Consumption And Cover Part Of The Facilitys Demand For Electricity During Hours Of Lower Solar Panel Efficiency. C) Development And Launch Of An Intelligent Energy Management System In Accordance With The Design Documentation. The System Should Enable Measurement, Operation, Monitoring And Management Of Energy Use, Including Cooperation With The Photovoltaic Installation, Energy Storage And Other Installations Covered By The Order. Detailed Technical, Functional And Operational Parameters Of The System Are Specified In The Design Documentation. As Part Of The Implementation Of The Subject Of The Order, The Contractor Is Also Obliged To: • Perform The Required Tests, Examinations, Commissioning And Control Measurements; • Prepare Photographic Documentation Of The Completed Installations, Including At Least Photovoltaic Panels, Inverters, Energy Storage, Cabling, Energy Management System Devices And Protective Earthing Measurement, In A Way That Allows Identification Of The Place Of Measurement And The Value Indicated By The Meter; • Prepare Complete As-Built Documentation In Two Copies In The Version Paper And In One Copy In An Electronic Version, Saved On An Electronic Data Car
Contact Information
Address
Gmina Łomazy,Łomazy,21-532,Lubelskie,Pl811 - Bialski
Email
przetargi@lomazy.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116097112
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.