|
The Subject Of The Order Is The Continuation Of The Task - Construction Of A Municipal Nursery With Technical Infrastructure, First Equipment And Land Development In Baczyna At Ul. Urocza, On The Plot With Registration Number 132/2, The Contractor Is Obliged To Carry Out Construction Works Consisting In The Completion Of An Investment Project Called: Construction Of A Service Building Serving As A Nursery Along With Technical Infrastructure, First Equipment And Land Development In Baczyn. The Order Includes: 1. Completion Of Works Started By The Previous Contractor And Execution Of Other Works Necessary To Start Using The Facility.2. Verification Of The Correct Execution And Operation Of All Installations And Equipment In The Facility, And In The Event Of Operating Irregularities, Determining The Causes And Determining The Actions Necessary To Obtain Appropriate Operational Parameters.3. Performing Tests, Inspections, Adjustments Of The Networks And Installations Performed By The Previous Contractor And Combining Them With Those Performed As A Result Of This Order.4. Execution Of Works And Deliveries Described In Swz And Annexes To Swz, Stwior Design Documentation, Bills Of Quantities, Work Inventory.5. Interior Design In Accordance With The Attached Arrangement Design Along With The First Equipment. 6. Submitting, On Behalf Of The Ordering Party, A Complete Set Of Documents For Permission To Use The Facility, Together With The Decision Of The District/Municipal Commander Of The State Fire Service - Confirming That The Premises Meet All Fire Protection Requirements And The Decision Of The State District Sanitary Inspector - Confirming The Fulfillment Of Sanitary And Premises Requirements For The Nursery7. The Deadline For Obtaining An Occupancy Permit Is Not Included In The Deadline For Completing The Subject Of The Order.8. The Order Completion Date Is Considered To Be The Final Acceptance Report Of Construction Works Signed By The Parties, Prepared On The Template Provided By The Ordering Party, Together With A Statement That The Contractor Has Submitted An Application For An Occupancy Permit With The Required Annexes. In The Scope Of The Order Covering The First Equipment For The Municipal Nursery In Accordance With The Design Documentation Attached To The Swz. The First Equipment Should Include The Elements Listed In The Design Documentation, Including: 1) Equipment For Individual Rooms (Furniture, Cots, Cabinets, Tables, Chairs, Changing Tables) 2) Kitchen Equipment (Furniture, Place For Heating Food, Devices For Sterilizing Bottles And Pacifiers, 3) Equipment Sanitary Facilities (Hand Dryers, Soap Dispensers, Containers For Paper Towels, Waste Bins, Mirrors, Hangers), 4) Other Elements Such As: Window Blinds Or Internal Wooden Blinds And External Roller Blinds, Cloakroom Equipment, Lighting Of Individual Rooms, Wall Decoration. The Contractor Is Obliged To Deliver Equipment And Appliances That Are Brand New, Of Full Value, Free From Defects
|