1) The Subject Of The Order Is The Implementation Of The Investment Titled: Construction Of A Cultural Building - A Hall For Ecological Education And Firefighting Traditions In Parnów Along With Construction Equipment. 2) Subject Of The Order The Subject Of The Order Are Works Related To The Construction Of A Cultural Building - A Hall For Ecological Education And Firefighting Traditions In Parnowo, Together With Construction Equipment On Plot No. 2/1, District No. 0040 Parnowo, Commune. Biesiekierz. The Investment Includes The Construction Of A Single-Story Building With A Simple, Compact Shape On A Rectangular Plan With Dimensions Of 12.00 M X 9.00 M And A Height Of 6.22 M, Designed In The Northern Part Of The Plot On The Edge Of The Existing Paved Area. The Plot Includes The Building Of The Volunteer Fire Department In Parnów, A Shelter And Outdoor Gym Equipment. The Area Around The Building Has Been Paved With Concrete Cubes, While The Rest Of The Plot Is Covered With Lawn, Bushes And Trees. The Technical Infrastructure Is Being Designed Along With The Building On The Investment Site. Category Of Building Structure: Ix.3) Environmental Protection Requirementsthe Planned Investment Is Not One Of The Projects That May Have A Significant Impact On The Environment. During The Implementation Of The Works, The Contractor Is Obliged To: A) Carry Out The Works In A Way That Minimizes The Impact On The Environment, B) Properly Manage The Waste Generated During The Works, C) Remove Demolition Materials To Legal Landfills, D) Maintain Order At The Construction Site. 4) The Works Should Be Carried Out In Accordance With The Design Documentation, Stwiorb, Applicable Provisions Of Construction Law, Polish Standards, Principles Of Technical Knowledge, Decision No. 450.2026.K West Pomeranian Voivodeship Conservator Of Monuments In Szczecin Of June 9, 2026, Reference Number: Zarch.K.5161.56.2026.M.5) All Materials And Devices Must Have The Required Certificates, Approvals And Certificates Allowing For Use In Construction.6) After Completing The Works, The Contractor Is Obliged To: A) Tidy Up The Investment Area, B) Perform An Inventory As-Built Surveying, C) Submitting As-Built Documentation, D) Submitting The Works For Final Acceptance.7) The Contractor Is Obliged To Obtain All Required Acceptances, Arrangements And Administrative Decisions Necessary To Complete The Investment, While Obtaining A Decision On The Permit To Use The Facility Rests With The Ordering Party. Note The Investment Is Located In An Archaeological Site Registered As: Parnowo, State. 32, Azp 15-19/81, Included In The Provincial Register Of Monuments. Due To The Above, Earthworks Related To The Implementation Of The Investment Must Be Carried Out Under The Supervision Of An Archaeologist. Decision No. 450.2026.K, Wzkz In Szczecin Of June 9, 2026, Was Obtained, Reference Number: Zarch.K.5161.56.2026.Mj, Allowing For Intervention Archaeological Research. Obligations Resulting From The Imple
|